Difference between revisions of "The HPS Run Wiki"

From hps run
Jump to navigation Jump to search
(15 intermediate revisions by the same user not shown)
Line 17: Line 17:
 
===[https://bta Beam Time Accounting]===
 
===[https://bta Beam Time Accounting]===
 
===[https://docs.google.com/spreadsheets/d/1X_TfOQyQBv9Ja1IQ5LYImk0sd00eN-d4zzkCwn-CSUM/edit#gid=43855609 Run Spreadsheet 2016], [https://docs.google.com/spreadsheets/d/1l1NurPpsmpgZKgr1qoQpLQBBLz1sszLz4xZF-So4xs8/edit#gid=43855609 2015]===
 
===[https://docs.google.com/spreadsheets/d/1X_TfOQyQBv9Ja1IQ5LYImk0sd00eN-d4zzkCwn-CSUM/edit#gid=43855609 Run Spreadsheet 2016], [https://docs.google.com/spreadsheets/d/1l1NurPpsmpgZKgr1qoQpLQBBLz1sszLz4xZF-So4xs8/edit#gid=43855609 2015]===
<!--* [http://www.jlab.org/~baltzell/HPS/engrun/HPS_Runs_2015.xlsx MSOffice], [http://www.jlab.org/~baltzell/HPS/engrun/HPS_Runs_2015.ods OpenOffice]-->
 
  
 
<!--* [[Media:hps_hallb_checklist.pdf|Hall-B Checklist Preparing for Beam]]-->
 
<!--* [[Media:hps_hallb_checklist.pdf|Hall-B Checklist Preparing for Beam]]-->
Line 86: Line 85:
  
 
= Short Term Schedule =
 
= Short Term Schedule =
<center><font color=blue size=4>
+
<center><font size=+5>
''' HPS 2016 run, February 4 to <font color=red>April 25</font>, Weekends Only  '''<br>
+
''' HPS 2019 run, June X to August Y''''<br>
''' Shifts are manned from Friday 2pm to Monday 7am '''<br>
+
''' Beam energy 4.5 GeV '''<br>
''' Beam energy 2.3 GeV (1 pass) '''<br>
+
''' Important: Document all your work in the logbook! '''<br>
''' Important: Document all your work in the logbook! '''<br></font>
+
[https://bluejeans.com/573852742 Bluejeans for Run Meetings on DAY and DAY at 2pm]
<font size=3>[https://bluejeans.com/573852742 Bluejeans for Run Meetings on Thursdays and Fridays at 2pm]</font></center>
+
</font></center>
  
== RC: Valery Kubarovsky ==
+
== RC: Stepan Stepanyan ==
 
* (757) 575-7540   
 
* (757) 575-7540   
 
* 9 575 7540 from Counting Room
 
* 9 575 7540 from Counting Room
== PDL: Stepan Stepanyan ==
+
== PDL: Valery Kubarovsky ==
 
*  (757) 876-1789  
 
*  (757) 876-1789  
 
* 9 876-1789 from Counting Room
 
* 9 876-1789 from Counting Room
 
== <font color=red>''' THIS WEEKEND ONLY: ECal, BEAM LINE PROBLEMS ->  CALL PDL (757) 876-1789 !!!! '''</font>==
 
  
 
{| {{TableStyle1}}  
 
{| {{TableStyle1}}  
Line 106: Line 103:
 
| valign=top width=50% |
 
| valign=top width=50% |
  
== Straight tracks run: April 25, 4:30 AM ==
+
== Straight tracks run: June XX, 4:30 AM ==
* Chikane magnets are OFF
+
* Chicane magnets are OFF
 
* Target is out
 
* Target is out
 
* Current 50 nA
 
* Current 50 nA
Line 113: Line 110:
 
* Use 2H02 Harp as a target
 
* Use 2H02 Harp as a target
 
* Tune trigger rate to 15 kHz by 2H02 harp wire position
 
* Tune trigger rate to 15 kHz by 2H02 harp wire position
* Take data up to 6:00AM
 
  
  
== <font color=blue>''' Run Plan for April 22 - 25, 2016 (every weekend): '''</font>==
+
== Run Plan for June XX - YY, 2019 ==
  
== Start close-up of the Hall at 3pm on Friday, April 22 ==
+
== Start close-up of the Hall at 3pm on Friday, June XX ==
 
* See General Instructions on the right for details
 
* See General Instructions on the right for details
 
== When hall enters Beam Permit, [https://wiki.jlab.org/hps-run/images/c/cd/Chicane_controls.pdf turn on the chicane]==
 
== When hall enters Beam Permit, [https://wiki.jlab.org/hps-run/images/c/cd/Chicane_controls.pdf turn on the chicane]==
Line 188: Line 184:
 
| valign=top |
 
| valign=top |
  
==<font color=blue><b>General Instructions:</b></font>==
+
==General Instructions==
  
===<font color=magenta><b>DAQ RECOVERY</b></font>===
+
===DAQ RECOVERY===
 
If DAQ crashed/broken:
 
If DAQ crashed/broken:
 
# For every daq crash login into clondaq3 as a clasrun then run the following command  
 
# For every daq crash login into clondaq3 as a clasrun then run the following command  
Line 306: Line 302:
 
==Every Run:==
 
==Every Run:==
 
# After "Go":  [https://logbooks.jlab.org/entry/3337784 Check SVT Occupancy]
 
# After "Go":  [https://logbooks.jlab.org/entry/3337784 Check SVT Occupancy]
# Update the [https://docs.google.com/spreadsheets/d/1X_TfOQyQBv9Ja1IQ5LYImk0sd00eN-d4zzkCwn-CSUM/edit#gid=43855609 Run Spreadsheet]
+
# Update the <strike>[https://docs.google.com/spreadsheets/d/1X_TfOQyQBv9Ja1IQ5LYImk0sd00eN-d4zzkCwn-CSUM/edit#gid=43855609 Run Spreadsheet]</strike>
 
# Log screenshots of:
 
# Log screenshots of:
 
#* main scaler_hps display
 
#* main scaler_hps display
Line 313: Line 309:
 
#* SVT and ECAL Monitoring pdfs  
 
#* SVT and ECAL Monitoring pdfs  
 
#* Put the output of the following command <font color=red>hpsTiStatus.sh </font>into the logbook
 
#* Put the output of the following command <font color=red>hpsTiStatus.sh </font>into the logbook
# After each run execute this script (replace RunNb by the actual run number):  
+
# <strike>After each run execute this script (replace RunNb by the actual run number):  
#* <tt> hps2tapeAndDelete.sh RunNb</tt>
+
#* <tt> hps2tapeAndDelete.sh RunNb</tt></strike>
 
# All trigger files to be used by shifters are in <tt>HPS/Run2016</tt>
 
# All trigger files to be used by shifters are in <tt>HPS/Run2016</tt>
  
Line 326: Line 322:
 
= Long Term Schedule =   
 
= Long Term Schedule =   
  
----
+
 
<center><font size=2 color=red >Spring 2016 Final @ 2.315 GeV:</font><br></center>.
 
[[Image:charge2016.png|center|900px]]
 
----
 
<center><font size=2 color=red >Spring 2015 Final @ 1 GeV:</font><br></center>.
 
[[Image:charge.png|center|900px]]
 
  
 
{| {{TableStyle1}}
 
{| {{TableStyle1}}
Line 346: Line 337:
 
!width=250 colspan=2 style="background:#ffdead;"| '''Run Coordinator'''
 
!width=250 colspan=2 style="background:#ffdead;"| '''Run Coordinator'''
 
|-
 
|-
| Feb 3 - Feb 10 || Stepan Stepanyan
+
| June X - June Y || Stepan Stepanyan
|-
 
| Feb 10 - Feb 17 || Takashi Maruyama
 
|-
 
| Feb 17 - Feb 24 || John Jaros
 
|-
 
| Feb 24 - Mar 2 || Rapha&euml;l Dupr&eacute;
 
|-
 
| Mar 2 - Mar 9 || Nathan Baltzell
 
|-
 
| Mar 9 - Mar 16 || Maurik Holtrop
 
|-
 
| Mar 17 - Mar 24 || Stepan Stepanyan
 
|-
 
| Mar 24 - Mar 30 || Valery Kubarovsky
 
 
|-
 
|-
| Mar 30 - Apr 6 || Stepan Stepanyan
+
| July X - July Y || Tim Nelson
|-
 
| Apr 6 - Apr 15 || Rafayel Paremuzyan
 
|-
 
| Apr 15 - Apr 20 || John Jaros
 
|-
 
| Apr 20 - Apr 25 ||  Valery Kubarovsky
 
 
|}
 
|}
  
Line 374: Line 345:
 
!width=250 colspan=2 style="background:#ffdead;"| '''Physics Division Liaison'''
 
!width=250 colspan=2 style="background:#ffdead;"| '''Physics Division Liaison'''
 
|-
 
|-
Feb 3 - Mar 16 || Harut Avagyan
+
2019 || Valery Kubarovsky
 
|}
 
|}
  
Line 382: Line 353:
 
!width=250 colspan=2 style="background:#ffdead;" | '''Beamline'''
 
!width=250 colspan=2 style="background:#ffdead;" | '''Beamline'''
 
|-
 
|-
| Feb 4 - Feb 10 || F.X. Girod
+
| June X - June Y || Rafo Paremuzyan
 
|-
 
|-
| Feb 10 - Feb 17 ||  Stepan Stepanyan
+
| July X - July 17 ||   
|-
 
| Feb 17 - Feb 24 || Rafo Paremuzyan
 
|-
 
| Feb 24 - Mar 2 ||  Clive Field
 
|-
 
| Mar 2 - Mar 9 || Takashi Maruyama
 
|-
 
| Mar 9 - Mar 16 || John Jaros
 
|-
 
| Mar 16 - Apr 6 || Stepan Stepanyan
 
|-
 
| Apr 6 - Apr 18 || Rafayel Paremuzyan
 
|-
 
| Apr 18 - Apr 25 || Stepan Stepanyan
 
 
|}
 
|}
  
Line 404: Line 361:
 
!width=250 colspan=2 style="background:#ffdead;" | '''SlowControls'''
 
!width=250 colspan=2 style="background:#ffdead;" | '''SlowControls'''
 
|-
 
|-
| Feb 4 - Feb 11 || Stepan Stepanyan
+
| June X - June Y || Nathan Baltzell
|-
 
| Feb 12 - Feb 18 || Sho Uemura
 
 
|-
 
|-
| Feb 19 - Feb 25 || Bryan McKinnon
+
| July X - July Y ||  
|-
 
| Feb 26 - Mar 10 || Hovanes Egiyan
 
|-
 
| Mar 11 - Apr 21 || Nathan Baltzell
 
|-
 
| Apr 21 - Apr 25 || Hovanes Egiyan
 
 
|}
 
|}
  
Line 421: Line 370:
 
!width=250 colspan=2 style="background:#ffdead;" | '''ECAL'''
 
!width=250 colspan=2 style="background:#ffdead;" | '''ECAL'''
 
|-
 
|-
| Feb 2 - Feb 9  || Holly Vance
+
| June 6 - June 23 || Holly Vance
 
|-
 
|-
| Feb 9 - Feb 16 || Nathan Baltzell
+
| June 24 - June 30 || Nathan Baltzell
 
|-
 
|-
| Feb 16 - Feb 23 || Rapha&euml;l Dupr&eacute;
+
| July 1 - July 7 || Raffaella DeVita
 
|-
 
|-
| Feb 23 - Mar 1 || Andrea Celentano
+
| July 8 - July 14 || Rafayel Paremuzyan
 
|-
 
|-
| Mar 1 - Mar 15 || Gabriel Charles
+
| July 15 - July 21 || Andrea Celentano
 
|-
 
|-
| Mar 17 - Apr 20 || Nathan Baltzell
+
| July 22 - July 28 || Rafayel Paremuzyan
 
|-
 
|-
| Apr 20 - Apr 25  || Holly Vance
+
| July 29 - August || Gabriel Charles
 
|}
 
|}
  
Line 439: Line 388:
 
!width=250 colspan=2 style="background:#ffdead;" | '''SVT'''
 
!width=250 colspan=2 style="background:#ffdead;" | '''SVT'''
 
|-
 
|-
| Feb 4 - Feb 12 || Matt Graham
+
| XXX - YYY || Cameron Bravo
 
|-
 
|-
| Feb 12 - Feb 19 || Sho Uemura
+
|  || Matt Solt
|-
 
| Feb 19 - Feb 26 || Matt Solt
 
|-
 
| Feb 26 - Mar 4 || Vitaliy Fadeyev
 
|-
 
| Mar 4 - Mar 14 || Tim Nelson
 
|-
 
| Mar 17 - Mar 28 || Matt Solt  
 
|-
 
| This Weekend || Tim Nelson
 
|-
 
| Next Weekend || Vitaliy Fadeyev
 
 
|}
 
|}
  
Line 463: Line 400:
 
<!--Michel Garcon:  Michel Gar&ccedil;on-->
 
<!--Michel Garcon:  Michel Gar&ccedil;on-->
 
|}
 
|}
 +
 +
----
 +
<center><font size=2 color=red >Spring 2016 Final @ 2.315 GeV:</font><br></center>.
 +
[[Image:charge2016.png|center|900px]]
 +
----
 +
<center><font size=2 color=red >Spring 2015 Final @ 1 GeV:</font><br></center>.
 +
[[Image:charge.png|center|900px]]
 +
 
<!--#######################################  MONITORING  #################################################-->
 
<!--#######################################  MONITORING  #################################################-->
 
<!--#######################################  MONITORING  #################################################-->
 
<!--#######################################  MONITORING  #################################################-->

Revision as of 20:16, 23 April 2019


[edit]

HPS 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm

RC: Stepan Stepanyan

  • (757) 575-7540
  • 9 575 7540 from Counting Room

PDL: Valery Kubarovsky

  • (757) 876-1789
  • 9 876-1789 from Counting Room

Straight tracks run: June XX, 4:30 AM

  • Chicane magnets are OFF
  • Target is out
  • Current 50 nA
  • Trigger "straight.trg"
  • Use 2H02 Harp as a target
  • Tune trigger rate to 15 kHz by 2H02 harp wire position


Run Plan for June XX - YY, 2019

Start close-up of the Hall at 3pm on Friday, June XX

  • See General Instructions on the right for details

When hall enters Beam Permit, turn on the chicane

Establish beam to the tagger dump

  1. See "General Instructions" on the right for details
  2. Log screenshots of the ECal and main HPS scaler screens for reference when beam is established at the tagger

Bring beam to FC:

  1. Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA. Before moving forward with 2H02A harp scans and beam profile tune, make sure orbit lock is engaged at positions on 2H00(X=0.00,Y=0.00) and on 2H02(X=-1.1,Y=-1.).
  2. Important Note: Before bringing beams to the FC, be sure that the SVT and ECal are off, the SVT fully retracted, the target out, and the 2.82 mm SVT collimator is in. All beam studies should be done in these conditions with beam currents of 30 nA.
  3. Establish beam to the Faraday cup following the "General Guidelines" on the right. The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.050 mm, and the tilt angle <15 degrees. The spot on the Chromax viewer should be close to x=-2mm, y=-5mm. Also make sure that Harp scans reproduce recent mean values of Beam X and and Y [1]. Vertically should be within 50 um match, horizontally 300 um should be enough.
  4. Restore ECal and Trigger
    • Turn on ECal
    • Record FADC rates with and without the 4 um target at 200 nA.
    • Call ECal expert to perform pedestal run
    • Trigger/DAQ expert checks trigger rates, DAQ, and deadtime with 200 nA beam on 4 um target. Record:
      1. main scaler screen
      2. ecal scaler gui
      3. trigger rate gui (requires DAQ Prestarted with v8_200nA.trg)
        • Live time should be >~90%
        • Total Trigger rate should be ~17 kHz.
  5. SVT Setting (call SVT expert in)
    • If beams are stable, SVT expert moves SVT to 1.0 and then 0.5 mm
    • record occupancy, latency, data size, and deadtimes
  6. Record Production Data with 4um target @ 200 nA
    • Use Configuration HPS35 and Trigger v8_200nA.trg.
    • 150 Million events per run
    • Be sure to follow General Guidelines, especially instructions for Every Shift and Every Run below.
    • Monitor and record BPM 2H02 history carefully to insure stable beams.
      • If beams are not stable, get MCC to fix it!
    • Document any beam condition change and send scaler GUIs to HBLOG
  7. Special (to be scheduled by RC)
    • 3.93 mm collimator
      • Scan to center it (update epics records)
      • Empty target run to compare rates with 2.82 mm collimator
    • Quick no-collimator rate measurement

Monday at 6:am

    • Call MCC to take the beam Off, and request a Restricted Access
    • Turn All SVT voltages Off (From SVT Summary GUI):
      • FEB ALL "OFF"
      • ALL SVT FLANGE "OFF"
      • ALL HYBRIDS "OFF"
      • ALL SVT BIAS "OFF"
    • Retract SVT stages to "Retracted" position
    • Turn the Chicane Off
    • Retract the target
  1. Take LED run according to this instructions (Sec. 8.2 and 8.3) [2]
    • Turn the ECal HV Off

Important Notes:

  1. Do not run more than 60 minutes above 30 nA without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents.

SVT RECOVERY PROCDURES

General Instructions

DAQ RECOVERY

If DAQ crashed/broken:

  1. For every daq crash login into clondaq3 as a clasrun then run the following command
    • clasrun@clondaq3:clasrun> save_DAQ_logs.pl (See [3])
  2. Reboot DAQ completely..
  3. If the procedure fails to restore DAQ, call Sergey (DAQ on call) without any further disturbing the DAQ status.

Locking up the hall on Fridays

  • At 2pm check the status of the activities in the hall and notify RC if there are potential delays for the lockup at 3pm.
  • Work with the hall work coordinator (Doug Tilles or his designee) to make sure hall is ready for sweep at around 3pm:
    • Vacuum is good, magnet power supplies are turned ON and in remote mode, LCW is on.
  • Make sure experts, beamline, ECal, SVT, and slow controls, checked their systems before the lockup.
  • When ready notify MCC to start sweep and lockup of the hall.
  • Make sure all necessary monitoring GUIs are up and running.
  • Make sure beam viewer screens are up.
  • When hall reaches "Beam Permit":

Establishing Acceptable Beam Conditions:

  1. Make sure SVT is retracted and both SVT and ECAL are OFF.
  2. First send beam to the tagger dump:
    • Check that beam type is set to "Photon" (HPS_EPICS->Beam->BTA).
    • Ask MCC to turn ON the tagger magnet and then deliver <10 nA beam.
    • Check the beam position on the tagger viewer, it should be approximately in the centre of the screen
    • Follow instructions under "Procedures" on the documentation tab for "Beamline"[4]. To tune the beam on tagger dump and perform harp scans beam current should be <10 nA.
    • Check profile using 2C21 and tagger harp scans, and compare the positions and widths with previous scans ([5],[6])
      • Positions on both harps should be within 1mm
      • Width on 2C21 should be <~0.1+/-0.05 mm
      • Width on tagger harp (2C24) <~0.35 +/- 0.1mm
    • Halo counters UPS-L/R and TAG-L/T/T2 should be ~few Hz/nA [7]
  3. Before sending beam to the Faraday cup
    • Check that chicane GUI says "Chicane Ready"
    • Check that SVT protection collimator is ON
    • HPS target is OUT and ECAL HV is OFF
    • SVT is OUT (position=0.000 mm in main hps scaler screen) and HV is off (all red/green indicators RED in SVT bias GUI)
    • If any uncertainty, page the experts
    • The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert.
    • Pay attention into following corrector values: 2C22H, 2C23V, 2H00H, 2H00V, Compare them to ones that are in [8]. Make sure their values doesn't differ more than 100%. If there is a such difference, tell MCC about this.
  4. Send beam to the Faraday cup
    • If the beam optics is correct, then you should immediately see the beam spot on the Downstream Viewer and beam position and on 2H00 and 2H02 BPMS.
    • If you don't see it immediately, and rates on halo counters are more than 100 Khz, then ask MCC, to change to pulsed (tune mode) beam, and ask to put corrector values. At this point don't accept any CW beam, until beam spot is visible on Downstream Viewer.
    • If MCC operator is not able to tune the beam more than 30 minutes, then please notify RC

Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.

    • Ask MCC to establish 30 nA beam with HPS orbit locks on (We need HallBHPSOrb not HallBOrb configuration). For orbit lock positions on 2H00(X=0.00,Y=0.00) and on 2H02(X=-1.00,Y=-0.85). Use the 2.82 mm SVT collimator. .
    • Tune beam profile at HPS using measured widths on 2H02A harp. The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.10 mm for commissioning, and Y-width ~0.05 for physics running, and the tilt angle <15 degrees.
    • Check and log the beam spot on chromax viewer
    • The halo counter rates before HPS must be low:
      1. UPS-L and UPS-R few Hz/nA,
      2. The tagger counters should count less than Hz/nA and downstream counters should count ~Hz/nA
      3. The halo counter rates on HPS, HPS-L/R/T/SC, depends on the collimator and HPS chicane settings, but should not be more than 100 Hz/nA [9]
    • Positions on BPMs must be close to what they were before [10]
    • Once all the above is achieved, turn ECAL HV ON to monitor and log ECal rates
    • Insert the 4um W target without turning off the beam.
  1. Before accepting beam, make sure all the previous conditions are met. Always read previous log entries, compare settings of BPMs and correctors with previous settings using scaler_hps GUI.

Setting up the FSD threshold

  • When you are about to calculate FSD limit, it means the beam is already established, and the target is in.
  • To calculate the FSD threshold run the folloing executable
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
  • Note we use 1 ms integration time, and want 5.5 sigma away from the average rates
  • Allowed tolerable rate increase default is 15%, if that causes many trips, then contact RC, he might suggest to increase that number
  • Make sure if MCC operator set the FSD limit and integration time correctly


Every Shift:

  1. Follow run plan as outlined by RC
  2. If any concern about beam stability, ask MCC if orbit locks are on (they should be).
  3. Keep shift summary up to date in HBLOG. Record all that happens.
    • Check on white board all scalers, strip charts and monitoring plots that need to be logged regularly
    • Document any beam condition change and send scaler GUIs to HBLOG
    • Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side.
    • Fill and submit the shift checklist in the logbook
  4. Perform 2H02A harp scan once per shift or when beam conditions have changed, based on beam monitors (BPMs, halo rates, beam-viewer). During harp scans SVT must be retracted and HV should be OFF.
  5. With any issue contact On-Call Experts or RC

Every Run:

  1. After "Go": Check SVT Occupancy
  2. Update the Run Spreadsheet
  3. Log screenshots of:
    • main scaler_hps display
    • ECAL FADC rate gui
    • Trigger rate gui
    • SVT and ECAL Monitoring pdfs
    • Put the output of the following command hpsTiStatus.sh into the logbook
  4. After each run execute this script (replace RunNb by the actual run number):
    • hps2tapeAndDelete.sh RunNb
  5. All trigger files to be used by shifters are in HPS/Run2016


Run Coordinator
June X - June Y Stepan Stepanyan
July X - July Y Tim Nelson
Physics Division Liaison
2019 Valery Kubarovsky
Beamline
June X - June Y Rafo Paremuzyan
July X - July 17
SlowControls
June X - June Y Nathan Baltzell
July X - July Y
ECAL
June 6 - June 23 Holly Vance
June 24 - June 30 Nathan Baltzell
July 1 - July 7 Raffaella DeVita
July 8 - July 14 Rafayel Paremuzyan
July 15 - July 21 Andrea Celentano
July 22 - July 28 Rafayel Paremuzyan
July 29 - August Gabriel Charles
SVT
XXX - YYY Cameron Bravo
Matt Solt
DAQ
24/7/365 Sergey Boyarinov

Spring 2016 Final @ 2.315 GeV:

.

Charge2016.png

Spring 2015 Final @ 1 GeV:

.

Charge.png


System/Person Pager/Phone Number
Run Coordinator (757) 575-7540 (cell)
Physics Div. Liaison (757) 876-1789 (cell)
MCC-OPS 7048
Crew Chief 7045
Crew Chief 9-879-3367 (cell)
Program Deputy 9-876-7997 (cell)
Gate House Guard 5822
DAQ/Online (757) 869-2188 (cell)
SVT (757) 541-7539 (cell)
ECAL (757) 810-1489 (cell)
Slow Controls (757) 748-6922 (cell)
Beamline (757) 303-3996 (cell)
Engineering (757) 748-5048
Hall-B Floor 5165
Hall-B Space Frame 5170, 5171
Hall-B Forward Carriage 5371
Hall-B Counting Room 5126, 5244, 5246, 5247
Hall-B Gas Shed 7115


Svtpic.png

Ecalpic.png