Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
(8 intermediate revisions by 2 users not shown) | |||
Line 13: | Line 13: | ||
==={{#switchtablink:Phone Numbers|'''Phone Numbers'''}}=== | ==={{#switchtablink:Phone Numbers|'''Phone Numbers'''}}=== | ||
===[http://www.jlab.org/Hall-B/hpsshifts Shift Schedule]=== | ===[http://www.jlab.org/Hall-B/hpsshifts Shift Schedule]=== | ||
− | ===[https://logbooks.jlab.org/checklists/ | + | ===[https://logbooks.jlab.org/checklists/530 Shift-Taker's Checklist] <!--([[Media:hps_shift_checklist.pdf|old]]) -->=== |
===[https://accweb.acc.jlab.org/hco/readiness Hot Checkout]=== | ===[https://accweb.acc.jlab.org/hco/readiness Hot Checkout]=== | ||
===[https://bta Beam Time Accounting]=== | ===[https://bta Beam Time Accounting]=== | ||
Line 94: | Line 94: | ||
</font></center> | </font></center> | ||
− | == RC: | + | == RC: Rafayel Paremuzyan == |
* (757) 575-7540 | * (757) 575-7540 | ||
* 9 575 7540 from Counting Room | * 9 575 7540 from Counting Room | ||
Line 102: | Line 102: | ||
=== <font color=red> * !! Chicane magnets can be energized only when the hall is in Beam Permit, [https://wiki.jlab.org/hps-run/images/c/cd/Chicane_controls.pdf]. Chicane magnets must be off if the hall is in Restricted or in Controlled access. </font> === | === <font color=red> * !! Chicane magnets can be energized only when the hall is in Beam Permit, [https://wiki.jlab.org/hps-run/images/c/cd/Chicane_controls.pdf]. Chicane magnets must be off if the hall is in Restricted or in Controlled access. </font> === | ||
+ | === <font color=red> * [https://bta.acc.jlab.org Fill out BTA] hourly. Click "Load from EPICS" to automatically fill the left side then make sure numbers are correct. If needed edit the entry. NO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%. </font> === | ||
{| {{TableStyle1}} | {| {{TableStyle1}} | ||
Line 107: | Line 108: | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | == Run Plan July | + | == Run Plan July 17-18, 2019 == |
Hot items: | Hot items: | ||
Line 120: | Line 121: | ||
When there is stable beam: | When there is stable beam: | ||
+ | # Pedestal Runs | ||
+ | #* Take pedestal runs with the target "In" | ||
+ | #* The target should be 4 um W | ||
+ | #* take three runs 5 minute runs with 50 nA, 100 nA and 150 nA current | ||
+ | #* The trigger file should be hps_v6_pedestal.trg | ||
# No target run | # No target run | ||
#* SVT running - including moving the SVT in - is still expert only; don't try to run with the SVT on without an expert | #* SVT running - including moving the SVT in - is still expert only; don't try to run with the SVT on without an expert | ||
Line 176: | Line 182: | ||
#* [https://bta.acc.jlab.org Fill out BTA] hourly. Click "Load from EPICS" to automatically fill the left side then make sure numbers are correct. If needed edit the entry. | #* [https://bta.acc.jlab.org Fill out BTA] hourly. Click "Load from EPICS" to automatically fill the left side then make sure numbers are correct. If needed edit the entry. | ||
#* Fill and submit the [https://logbooks.jlab.org/checklists/151 shift checklist in the logbook] | #* Fill and submit the [https://logbooks.jlab.org/checklists/151 shift checklist in the logbook] | ||
+ | |||
+ | ==Every Run:== | ||
+ | # After "Go": [https://logbooks.jlab.org/entry/3337784 Check SVT Occupancy] | ||
+ | # Update the [https://docs.google.com/spreadsheets/d/1Ru4weeIOqtcpebiXKxFGCbPXGWXZF-W2JAolHcpvIFU/edit#gid=43855609 Run Spreadsheet] | ||
+ | # Log screenshots of: | ||
+ | #* main scaler_hps display | ||
+ | #* ECAL FADC rate gui | ||
+ | #* Trigger rate gui | ||
+ | #* SVT and HODOSCOPE and ECAL Monitoring pdfs | ||
=== Important Notes: === | === Important Notes: === | ||
Line 274: | Line 289: | ||
!align=left width=50% style="background:#eeeeee;"| | !align=left width=50% style="background:#eeeeee;"| | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|} | |} |
Revision as of 22:07, 17 July 2019
[edit]
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERRCOO, ESAD, RSAD Things to read before shift. |
Procedures
|
Manuals |
JLab Logbooks
|
HPS (E12-11-006) 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Rafayel Paremuzyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
* !! Chicane magnets can be energized only when the hall is in Beam Permit, [1]. Chicane magnets must be off if the hall is in Restricted or in Controlled access.
* Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side then make sure numbers are correct. If needed edit the entry. NO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%.
Run Plan July 17-18, 2019Hot items:
Schedule and plans:
Every Shift:
Every Run:
Important Notes:
|
General InstructionsEstablishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
|
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator:
|
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |