Line 108: | Line 108: | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | == Run Plan July | + | == Run Plan July 18-19, 2019 == |
Hot items: | Hot items: | ||
Line 115: | Line 115: | ||
# Data taking with SVT at 0.5 mm using v6 trigger. | # Data taking with SVT at 0.5 mm using v6 trigger. | ||
− | Schedule and plans: | + | <!-- Schedule and plans: |
# Plan to re-establish beam to Hall B for HPS. Follow "General Guidelines" on the right and the Beamline Procedures and Manual on the shift documentation page. | # Plan to re-establish beam to Hall B for HPS. Follow "General Guidelines" on the right and the Beamline Procedures and Manual on the shift documentation page. | ||
− | # Perform collimator scan to make sure the beam is centered on the collimator. Call beamline expert. | + | # Perform collimator scan to make sure the beam is centered on the collimator. Call beamline expert. --> |
+ | ========================= task consequence ===================== | ||
− | + | <font color=red> SVT DAQ work has a priority now, any time SVT experts request any changes in DAQ or beam, | |
− | + | the program needs to be stopped and continued as SVT experts Matt. G. or Cameroon will tell. </font> | |
− | # | + | |
− | + | # Continue the Run 9870 until Andrea will ask for the DAQ. | |
− | #* take | + | #* Andrea then will take an LED Run, and then will take another short Run to check new Gains |
− | |||
# No target run | # No target run | ||
#* SVT running - including moving the SVT in - is still expert only; don't try to run with the SVT on without an expert | #* SVT running - including moving the SVT in - is still expert only; don't try to run with the SVT on without an expert | ||
Line 140: | Line 140: | ||
#* Target: 4 microns W | #* Target: 4 microns W | ||
#* Current: 30 nA | #* Current: 30 nA | ||
+ | # v6 NoHodoTET | ||
+ | #* Beam current 100 nA, or as high as SVT experts will agree on. | ||
+ | #* Configuration: PROD66 | ||
+ | #* Take 15M events with hps_v6_NoHodoTET.trg | ||
+ | #* This is the same as the v6. with only difference that only for Hodo channels TET is set to 0. | ||
+ | #* This run will allow to choose TET values for Hodoscope | ||
# v6 run | # v6 run | ||
#* Configuration: PROD66 | #* Configuration: PROD66 | ||
Line 180: | Line 186: | ||
#* Check on white board all scalers, strip charts and monitoring plots that need to be logged regularly | #* Check on white board all scalers, strip charts and monitoring plots that need to be logged regularly | ||
#* Document any beam condition change and send scaler GUIs to HBLOG | #* Document any beam condition change and send scaler GUIs to HBLOG | ||
− | #* [https://bta.acc.jlab.org Fill out BTA] hourly. Click "Load from EPICS" to automatically fill the left side then make sure numbers are correct. If needed edit the entry. | + | #* [https://bta.acc.jlab.org Fill out BTA] hourly. Click "Load from EPICS" to automatically fill the left side then make sure numbers are correct. If needed edit the entry. Note: in the "Sift information" tab choose experiment <font color=blue> E12-11-006. </font> |
#* Fill and submit the [https://logbooks.jlab.org/checklists/151 shift checklist in the logbook] | #* Fill and submit the [https://logbooks.jlab.org/checklists/151 shift checklist in the logbook] | ||
Revision as of 20:00, 18 July 2019
[edit]
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERRCOO, ESAD, RSAD Things to read before shift. |
Procedures
|
Manuals |
JLab Logbooks
|
HPS (E12-11-006) 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Rafayel Paremuzyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
* !! Chicane magnets can be energized only when the hall is in Beam Permit, [1]. Chicane magnets must be off if the hall is in Restricted or in Controlled access.
* Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side then make sure numbers are correct. If needed edit the entry. NO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%.
Run Plan July 18-19, 2019Hot items:
=================== task consequence ===============SVT DAQ work has a priority now, any time SVT experts request any changes in DAQ or beam, the program needs to be stopped and continued as SVT experts Matt. G. or Cameroon will tell.
Every Shift:
Every Run:
Important Notes:
|
General InstructionsEstablishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
|
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator:
|
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |