Difference between revisions of "The HPS Run Wiki"

From hps run
Jump to navigation Jump to search
Line 72: Line 72:
 
| valign=top |
 
| valign=top |
  
==Run Coordinator==  
+
==Run Coordinator: Stepan Stepanyan==  
 
  <font size=+2>Stepan Stepanyan</font>
 
  <font size=+2>Stepan Stepanyan</font>
  

Revision as of 12:03, 9 November 2014

[edit]

Run Coordinator: Stepan Stepanyan

Stepan Stepanyan

Every Shift:

  1. Follow run plan as outlined by RC
  2. Keep shift summery up-to-date in HBLOG
  3. Document any beam condition change and send scaler GUIs to HBLOG
  4. Continuously check quality of data

Every Run:

  1. a
  2. b
  3. c
  4. d


MCC Daily Meetings


Run Plan: Nov. 9 - Nov. 10

Upstream beamline commissioning and beam tune using the tagger dump (beam will not go through the Hall). The goal is to get beam parameters on 2C24 harp (tagger harp) close to values obtained with 6 GeV machine

Beam
Energy 0.0 GeV
Current 0.0 nA
Position
X Y
+0 mm -0 mm
Profile
X Y
0 mm 0 mm
Target
#1 0 mm
Magnets
PS Current 0 A
Chicane Dipole #1 0 A
Chicane Dipole #2 0 A
DAQ
Configuration ___________________
Configuration file
Prescales
Thresholds
Events Per Run
Dead Time



AccumulatedCharge.png


Run Coordinator
DATE NAME
DATE NAME
DATE NAME
DATE NAME
Physics Division Liaison
DATE NAME
DATE NAME
DATE NAME
DATE NAME