Difference between revisions of "The HPS Run Wiki"

From hps run
Jump to navigation Jump to search
Line 95: Line 95:
  
 
== Run Plan: Nov. 9 - Nov. 10 ==
 
== Run Plan: Nov. 9 - Nov. 10 ==
<font size=+14>Upstream beamline commissioning and beam tune using the tagger dump (beam will not go through the Hall). The goal is to get beam parameters on 2C24 harp (tagger harp) close to values obtained with 6 GeV machine. </font>
+
<font size=+24>Upstream beamline commissioning and beam tune using the tagger dump (beam will not go through the Hall). The goal is to get beam parameters on 2C24 harp (tagger harp) close to values obtained with 6 GeV machine. </font>
  
 
{|
 
{|

Revision as of 12:07, 9 November 2014

[edit]

RC: Stepan Stepanyan

PDL: Harut Avagyan

Every Shift:

  1. Follow run plan as outlined by RC
  2. Keep shift summery up-to-date in HBLOG
  3. Document any beam condition change and send scaler GUIs to HBLOG
  4. Continuously check quality of data

Every Run:

  1. a
  2. b
  3. c
  4. d


MCC Daily Meetings


Run Plan: Nov. 9 - Nov. 10

Upstream beamline commissioning and beam tune using the tagger dump (beam will not go through the Hall). The goal is to get beam parameters on 2C24 harp (tagger harp) close to values obtained with 6 GeV machine.

Beam
Energy 0.0 GeV
Current 0.0 nA
Position
X Y
+0 mm -0 mm
Profile
X Y
0 mm 0 mm
Target
#1 0 mm
Magnets
PS Current 0 A
Chicane Dipole #1 0 A
Chicane Dipole #2 0 A
DAQ
Configuration ___________________
Configuration file
Prescales
Thresholds
Events Per Run
Dead Time



AccumulatedCharge.png


Run Coordinator
DATE NAME
DATE NAME
DATE NAME
DATE NAME
Physics Division Liaison
DATE NAME
DATE NAME
DATE NAME
DATE NAME