*; Progress of CPS design (Tim, Pavel)
 
*; Progress of CPS design (Tim, Pavel)
 
**; [[media:CPS Z Positions.pdf | CPS Beamline layout]]
 
**; [[media:CPS Z Positions.pdf | CPS Beamline layout]]
**; [[media:K0LmtgMay29.pdf | CPS Model Update – May 2024, “KLCPS80”]]
 
 
**; Tim:  
 
**; Tim:  
 
     - prototype of absorber - next two months
 
     - prototype of absorber - next two months
Line 11: Line 10:
 
     - magnet and absorber design is nearly finalized (99% ready)
 
     - magnet and absorber design is nearly finalized (99% ready)
 
     - reduced dose allow to operate with cheap resin
 
     - reduced dose allow to operate with cheap resin
 +
 +
**; [[media:K0LmtgMay29.pdf | CPS Model Update – May 2024, “KLCPS80”]]
 
**; Pavel:
 
**; Pavel:
 
     - updated model of CPS. Main motivation to accommodate technical requirements, like all joints outside shielding
 
     - updated model of CPS. Main motivation to accommodate technical requirements, like all joints outside shielding
Line 30: Line 31:
 
**; Assume MRI magnet comes directly to hall when available
 
**; Assume MRI magnet comes directly to hall when available
 
     - Space is requested from the lab, no problem with allocations are expected
 
     - Space is requested from the lab, no problem with allocations are expected
    - Thermal cycling (Tim):
 
    - All seems to be good
 
  
 
*; Recommendation #4 from ERR-1 (Moskov)
 
*; Recommendation #4 from ERR-1 (Moskov)
Line 41: Line 40:
 
*: Results of the studies
 
*: Results of the studies
 
*: Statement regarding thermal cycling of the targets receiving >1 KW power.  
 
*: Statement regarding thermal cycling of the targets receiving >1 KW power.  
 +
    - Thermal cycling (Tim):
 +
    - All seems to be good
  
 
*; Any other business.  
 
*; Any other business.  
Line 49: Line 50:
 
     - Without a magnet two layers are sufficient -> reduction of channels # by factor of 2 -> 122*4*2~1000 channels.
 
     - Without a magnet two layers are sufficient -> reduction of channels # by factor of 2 -> 122*4*2~1000 channels.
 
     - '''Eugene's comment''': TDC from Hall-B might be available and sufficient for this. (will be explored).
 
     - '''Eugene's comment''': TDC from Hall-B might be available and sufficient for this. (will be explored).
**; '''On the next meeting, Ilya will report the KL rate from Be-target extracted from PRad measurements.'''
+
<!-- **; '''On the next meeting, Ilya will report the KL rate from Be-target extracted from PRimex measurements.''' -->
  
 
= Minutes =
 
= Minutes =

Latest revision as of 13:37, 4 June 2024

Agenda

  • Announcements
   - prototype of absorber - next two months
   - finalization of shielding in terms of installation and deinstallation
   - magnet and absorber design is nearly finalized (99% ready)
   - reduced dose allow to operate with cheap resin
   - updated model of CPS. Main motivation to accommodate technical requirements, like all joints outside shielding
   - new model reduces dose on magnet coils.
   - 2025 is feasible, but would require additional manpower to parallelize operations.
   - 2026 is rather relaxed.
   - Budget profile is on the way.
   - Answer to a question from Igor: an early pre-installation of CPS is not possible due to conflict in location with existing equipment.
  • Space at the lab (Tim, Eugene)
    • Need 700 sq ft general indoor storage on or off site
      200 sq ft in ESB (KFM detector check out)
      Additional 150 sq ft in lead shed
      Assume MRI magnet comes directly to hall when available
   - Space is requested from the lab, no problem with allocations are expected
  • Recommendation #4 from ERR-1 (Moskov)
    Results of the studies
    Statement regarding the studies of KLF compatibility with MOLLER.
    On May 24, Moskov reported that accelerator folks did not have a time to check a situation with Moeller vs KLF in May and will do that in November.
  • Recommendation #5 from ERR-1 (Tim)
    Results of the studies
    Statement regarding thermal cycling of the targets receiving >1 KW power.
   - Thermal cycling (Tim):
   - All seems to be good
  • Any other business.
    • Mikhail reported a tentative schedule for the KFM parts to be moved from Juelich to JLab.
   - Expected deinstallation - beginning of August.
   - Possible contribution from Juelich for equipment transfer.
   - Possible additional funding for tracker electronics
   - Without a magnet two layers are sufficient -> reduction of channels # by factor of 2 -> 122*4*2~1000 channels.
   - Eugene's comment: TDC from Hall-B might be available and sufficient for this. (will be explored).

Minutes

Present: Mikhail, Tim, Edy, Pavel, Eugene, Marshall, Hovanes, Eduard, Vitaly, Beni, P.D., Igor