Difference between revisions of "KLF beamline meeting - May 29, 2024"
Jump to navigation
Jump to search
(5 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
*; Progress of CPS design (Tim, Pavel) | *; Progress of CPS design (Tim, Pavel) | ||
**; [[media:CPS Z Positions.pdf | CPS Beamline layout]] | **; [[media:CPS Z Positions.pdf | CPS Beamline layout]] | ||
− | |||
**; Tim: | **; Tim: | ||
- prototype of absorber - next two months | - prototype of absorber - next two months | ||
Line 11: | Line 10: | ||
- magnet and absorber design is nearly finalized (99% ready) | - magnet and absorber design is nearly finalized (99% ready) | ||
- reduced dose allow to operate with cheap resin | - reduced dose allow to operate with cheap resin | ||
+ | |||
+ | **; [[media:K0LmtgMay29.pdf | CPS Model Update – May 2024, “KLCPS80”]] | ||
**; Pavel: | **; Pavel: | ||
- updated model of CPS. Main motivation to accommodate technical requirements, like all joints outside shielding | - updated model of CPS. Main motivation to accommodate technical requirements, like all joints outside shielding | ||
Line 30: | Line 31: | ||
**; Assume MRI magnet comes directly to hall when available | **; Assume MRI magnet comes directly to hall when available | ||
- Space is requested from the lab, no problem with allocations are expected | - Space is requested from the lab, no problem with allocations are expected | ||
− | |||
− | |||
*; Recommendation #4 from ERR-1 (Moskov) | *; Recommendation #4 from ERR-1 (Moskov) | ||
Line 41: | Line 40: | ||
*: Results of the studies | *: Results of the studies | ||
*: Statement regarding thermal cycling of the targets receiving >1 KW power. | *: Statement regarding thermal cycling of the targets receiving >1 KW power. | ||
+ | - Thermal cycling (Tim): | ||
+ | - All seems to be good | ||
*; Any other business. | *; Any other business. | ||
− | |||
**; '''Mikhail reported a tentative schedule for the KFM parts to be moved from Juelich to JLab.''' | **; '''Mikhail reported a tentative schedule for the KFM parts to be moved from Juelich to JLab.''' | ||
- Expected deinstallation - beginning of August. | - Expected deinstallation - beginning of August. | ||
Line 50: | Line 50: | ||
- Without a magnet two layers are sufficient -> reduction of channels # by factor of 2 -> 122*4*2~1000 channels. | - Without a magnet two layers are sufficient -> reduction of channels # by factor of 2 -> 122*4*2~1000 channels. | ||
- '''Eugene's comment''': TDC from Hall-B might be available and sufficient for this. (will be explored). | - '''Eugene's comment''': TDC from Hall-B might be available and sufficient for this. (will be explored). | ||
+ | **; '''On the next meeting, Ilya will report the KL rate from Be-target extracted from PRad measurements.''' | ||
= Minutes = | = Minutes = |
Revision as of 11:22, 30 May 2024
Agenda
- Announcements
- Progress of CPS design (Tim, Pavel)
- prototype of absorber - next two months - finalization of shielding in terms of installation and deinstallation - magnet and absorber design is nearly finalized (99% ready) - reduced dose allow to operate with cheap resin
- updated model of CPS. Main motivation to accommodate technical requirements, like all joints outside shielding - new model reduces dose on magnet coils.
- New design, construction, and installation schedule estimates (Tim)
- 2025 is feasible, but would require additional manpower to parallelize operations. - 2026 is rather relaxed. - Budget profile is on the way. - Answer to a question from Igor: an early pre-installation of CPS is not possible due to conflict in location with existing equipment.
- Space at the lab (Tim, Eugene)
- Need 700 sq ft general indoor storage on or off site
- 200 sq ft in ESB (KFM detector check out)
- Additional 150 sq ft in lead shed
- Assume MRI magnet comes directly to hall when available
- Space is requested from the lab, no problem with allocations are expected
- Recommendation #4 from ERR-1 (Moskov)
- Results of the studies
- Statement regarding the studies of KLF compatibility with MOLLER.
- On May 24, Moskov reported that accelerator folks did not have a time to check a situation with Moeller vs KLF in May and will do that in November.
- Recommendation #5 from ERR-1 (Tim)
- Results of the studies
- Statement regarding thermal cycling of the targets receiving >1 KW power.
- Thermal cycling (Tim): - All seems to be good
- Any other business.
- Mikhail reported a tentative schedule for the KFM parts to be moved from Juelich to JLab.
- Expected deinstallation - beginning of August. - Possible contribution from Juelich for equipment transfer. - Possible additional funding for tracker electronics - Without a magnet two layers are sufficient -> reduction of channels # by factor of 2 -> 122*4*2~1000 channels. - Eugene's comment: TDC from Hall-B might be available and sufficient for this. (will be explored).
- On the next meeting, Ilya will report the KL rate from Be-target extracted from PRad measurements.
Minutes
Present: Mikhail, Tim, Edy, Pavel, Eugene, Marshall, Hovanes, Eduard, Vitaly, Beni, P.D., Igor