Difference between revisions of "December 7th, 2016"

From kl project
Jump to navigation Jump to search
Line 18: Line 18:
  
 
4) Simulate a few KL-induced reactions in the LH2 target and evaluate the acceptance, resolutions, background etc.
 
4) Simulate a few KL-induced reactions in the LH2 target and evaluate the acceptance, resolutions, background etc.
Simulate the interactions of the KL and n in the material of the GlueX setup.
 
  
5) Calculate the spectrum (p,theta) of the KL and n coming from the Be target.
+
5) Simulate the interactions of the KL and n in the material of the GlueX setup.
  
6) For hyperon spectroscopy
+
6) Calculate the spectrum (p,theta) of the KL and n coming from the Be target.
 +
 
 +
7) Hyperon spectroscopy
  
 
-- ds/dO for KLp-->K+n (Mikhail).
 
-- ds/dO for KLp-->K+n (Mikhail).
Line 32: Line 33:
 
-- ds/dO for xxx ?
 
-- ds/dO for xxx ?
  
7) For meson spectroscopy (Volker).
+
8) Meson spectroscopy (Volker).
 +
 
 +
9) Strange meson physics (Lei).
  
8) For Strange meson physics (Lei).
+
10) CP-violation (Moskov)
  
9) For CP-violation (Moskov)
+
11) Status of neutron background simulations (Igor) [[https://halldweb.jlab.org/wiki/images/6/68/KL.pdf]]
  
10) Status of neutron background simulations (Igor) [[https://halldweb.jlab.org/wiki/images/6/68/KL.pdf]]
+
12) Simulate the n-interaction in the LH2 target with the neutron flux will be reasonable.
  
11) Simulate the n-interaction in the LH2 target with the neutron flux will be reasonable.
+
13) RedCon issues.
  
12) Schedule for the next meeting - in a month (January 4th, 2017)
+
14) Schedule for the next meeting - in a month (January 4th, 2017)

Revision as of 12:05, 9 December 2016

The Agenda [attended 16 people: Moskov, Avetik, Chen, Franz, Justin, Lei, Mikhail, Nick, Paul, Volker, Kijun, Simon, Igor and three more people via phone]:

1) Our schedule for the proposal (back in time):

- We may expect that PAC will be scheduled for July.

- We have to submit our proposal 6 weeks in advance (May-June).

- It will probably take 4 weeks for the GlueX Collaboration to review (April-May).

- In March, we plan to ask Rolf for a technical review (Jim Napolitano's suggestion).

- GlueX Collab meeting is scheduled for Feb 16-18 and we have to talk about KL.

2) We have to make a conceptual design of the KL project which allows to estimate a cost of the KL (Jim Napolitano's suggestion). To do that we have to draw a Note and then ask Eugene to ask Tim to make it.

3) Put the right LH2 target and beamline into GlueX MC.

4) Simulate a few KL-induced reactions in the LH2 target and evaluate the acceptance, resolutions, background etc.

5) Simulate the interactions of the KL and n in the material of the GlueX setup.

6) Calculate the spectrum (p,theta) of the KL and n coming from the Be target.

7) Hyperon spectroscopy

-- ds/dO for KLp-->K+n (Mikhail).

-- ds/dO for KLp-->KSp (Mikhail).

-- ds/dO and Sigma for KLp-->K+Xi (Nick, Lei).

-- ds/dO for xxx ?

8) Meson spectroscopy (Volker).

9) Strange meson physics (Lei).

10) CP-violation (Moskov)

11) Status of neutron background simulations (Igor) [[1]]

12) Simulate the n-interaction in the LH2 target with the neutron flux will be reasonable.

13) RedCon issues.

14) Schedule for the next meeting - in a month (January 4th, 2017)