Difference between revisions of "March 28th, 2022"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
<b>Attended</b>: and ''Igor''. | <b>Attended</b>: and ''Igor''. | ||
− | [https://halldweb.jlab.org/wiki/index.php/March_03,_2022_KLONG_Phase_II_Design_Meeting] | + | |
+ | * On February 17th, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/March_03,_2022_KLONG_Phase_II_Design_Meeting] |
Revision as of 13:22, 3 March 2022
Attended: and Igor.
- On February 17th, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [1]