Difference between revisions of "March 28th, 2022"
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
* On March 3rd, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/March_03,_2022_KLONG_Phase_II_Design_Meeting] | * On March 3rd, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/March_03,_2022_KLONG_Phase_II_Design_Meeting] | ||
− | * In particular, Vitaly performed simulations for CPS using FLUKA [https://wiki.jlab.org/klproject/images/f/fe/BaturinMarch22.pptx] | + | * In particular, ''Vitaly'' performed simulations for CPS using FLUKA and reported on ''Tim's'' meeting [https://wiki.jlab.org/klproject/images/f/fe/BaturinMarch22.pptx] |
+ | |||
+ | |||
+ | * On March 11th, we had a ''Hovanes'' meeting for a development of the engineering design of the Tiger hall with CPS [] |
Revision as of 08:51, 11 March 2022
Attended: and Igor.
- On March 3rd, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [1]
- In particular, Vitaly performed simulations for CPS using FLUKA and reported on Tim's meeting [2]
- On March 11th, we had a Hovanes meeting for a development of the engineering design of the Tiger hall with CPS []