Difference between revisions of "March 28th, 2022"
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
* On March 11th, we had a ''Hovanes''' meeting for a development of the engineering design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_March_11,_2022] | * On March 11th, we had a ''Hovanes''' meeting for a development of the engineering design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_March_11,_2022] | ||
+ | |||
+ | * On January 21st, ''Moskov'' had a ''128-ns'' meeting with injector folks (''Reza Kazimi'', ''Alicia Hofler'', ''Geoffrey Krafft'', ''Shukui Zhang'', ''Max Bruker'', and ''Joe Grames''). ''Sunil's'' slides are here [https://wiki.jlab.org/klproject/images/3/37/Presentation5.pdf]. It looks that we are getting close to converge. Injector people are thinking to make a test at the end of run. |
Revision as of 13:35, 18 March 2022
Attended: and Igor.
- On March 3rd, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [1]
- In particular, Vitaly performed simulations for CPS using FLUKA and reported on Tim's meeting [2]
- On March 11th, we had a Hovanes' meeting for a development of the engineering design of the Tiger hall with CPS [3]
- On January 21st, Moskov had a 128-ns meeting with injector folks (Reza Kazimi, Alicia Hofler, Geoffrey Krafft, Shukui Zhang, Max Bruker, and Joe Grames). Sunil's slides are here [4]. It looks that we are getting close to converge. Injector people are thinking to make a test at the end of run.