Difference between revisions of "March 28th, 2022"
Jump to navigation
Jump to search
Line 8: | Line 8: | ||
* On March 11th, we had a ''Hovanes''' meeting for a development of the engineering design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_March_11,_2022] | * On March 11th, we had a ''Hovanes''' meeting for a development of the engineering design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_March_11,_2022] | ||
− | * On | + | * On March 18th, ''Moskov'' had a ''128-ns'' meeting with injector folks. ''Sunil's'' slides are here [https://wiki.jlab.org/klproject/images/7/7b/Presentation6.pdf]. It looks promising. |
Revision as of 13:37, 18 March 2022
Attended: and Igor.
- On March 3rd, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [1]
- In particular, Vitaly performed simulations for CPS using FLUKA and reported on Tim's meeting [2]
- On March 11th, we had a Hovanes' meeting for a development of the engineering design of the Tiger hall with CPS [3]
- On March 18th, Moskov had a 128-ns meeting with injector folks. Sunil's slides are here [4]. It looks promising.