Difference between revisions of "March 28th, 2022"

From kl project
Jump to navigation Jump to search
Line 1: Line 1:
<b>Attended</b>:  and ''Igor''.
+
<b>Attended</b>:  ''Mikhail'', ''Justin'', ''Moskov'', ''Hovanes'', and ''Igor''.
  
  

Revision as of 07:09, 28 March 2022

Attended: Mikhail, Justin, Moskov, Hovanes, and Igor.


  • On March 3rd, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [1]
  • In particular, Vitaly performed simulations for CPS using FLUKA and reported on Tim's meeting [2]
  • On March 11th, we had a Hovanes' meeting for a development of the engineering design of the Tiger hall with CPS [3]. It has Vitaly's slides.
  • On March 18th, Moskov had a 128-ns meeting with injector folks. Sunil's slides are here [4]. It looks promising.
  • On March 25th, Tanja had a CPS meeting (main focus is CPS for Hall C) [5]. Vitaly gave a talk.
  • On March 25th, we had a Hovanes' meeting for a development of the engineering design of the Tiger hall with CPS [6]. It has Vitaly's slides.