Difference between revisions of "June 20th, 2022"
Jump to navigation
Jump to search
Line 6: | Line 6: | ||
* Since time of approval of our KLF proposal, GlueX setting got new software and two new elements of basic equipment: DIRC and FCAL-II. Can we consider to select a ''physics coordinator''. | * Since time of approval of our KLF proposal, GlueX setting got new software and two new elements of basic equipment: DIRC and FCAL-II. Can we consider to select a ''physics coordinator''. | ||
+ | |||
+ | * On June 17th, we had a ''Hovanes'' CPS meeting for a development of the engineering design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_June_17,_2022]. |
Revision as of 07:46, 17 June 2022
Attended: ... and Igor.
- On May 24-26, GlueX Collaboration had a meeting [1]. Talks by Eugene' and Tim mantioned a development for the KLF.
- On May 27th, we had 5th KLF Collaboration meeting [2]. We had 30+ people attended our meeting. We have a productive discussion about a status of the project and future direction - what-to-do.
- Since time of approval of our KLF proposal, GlueX setting got new software and two new elements of basic equipment: DIRC and FCAL-II. Can we consider to select a physics coordinator.
- On June 17th, we had a Hovanes CPS meeting for a development of the engineering design of the Tiger hall with CPS [3].