Difference between revisions of "June 20th, 2022"

From kl project
Jump to navigation Jump to search
Line 7: Line 7:
 
* Since time of approval of our KLF proposal, GlueX setting got new software and two new elements of basic equipment: DIRC and FCAL-II. Can we consider to select a ''physics coordinator''.
 
* Since time of approval of our KLF proposal, GlueX setting got new software and two new elements of basic equipment: DIRC and FCAL-II. Can we consider to select a ''physics coordinator''.
  
* On June 17th, we had a ''Hovanes'' CPS meeting for a development of the engineering design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_June_17,_2022].
+
* On June 17th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_June_17,_2022].

Revision as of 07:23, 20 June 2022

Attended: ... and Igor.

  • On May 24-26, GlueX Collaboration had a meeting [1]. Talks by Eugene' and Tim mantioned a development for the KLF.
  • On May 27th, we had 5th KLF Collaboration meeting [2]. We had 30+ people attended our meeting. We have a productive discussion about a status of the project and future direction - what-to-do.
  • Since time of approval of our KLF proposal, GlueX setting got new software and two new elements of basic equipment: DIRC and FCAL-II. Can we consider to select a physics coordinator.
  • On June 17th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [3].