Difference between revisions of "June 20th, 2022"

From kl project
Jump to navigation Jump to search
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
<b>Attended</b>: ... and ''Igor''.
+
<b>Attended</b>: ''Moskov'', ''Jim'', ''Sean'', and ''Igor''. ''Mikhail'' is on shifts, ''Justin'' has family busines.
  
* On May 24-26, GlueX Collaboration had a meeting [https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-May-2022]. Talks by ''Eugene' and ''Tim'' mantioned a development for the KLF.
+
* On May 24-26, GlueX Collaboration had a meeting [https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-May-2022]. Talks by ''Eugene'' and ''Tim'' mantioned a development for the KLF.
  
* On May 27th, we had 5th KLF Collaboration meeting [https://wiki.jlab.org/klproject/index.php/May,_27th_2022]. We had 30+ people attended our meeting. We have a productive discussion about a status of the project and future direction - what-to-do.
+
* On May 27th, we had 5th KLF Collaboration meeting [https://wiki.jlab.org/klproject/index.php/May,_27th_2022]. 30+ people attended our meeting. We have a productive discussion about a status of the project and future direction - what-to-do.
  
* Since time of approval of our KLF proposal, GlueX setting got new software and two new elements of basic equipment: DIRC and FCAL-II. Can we consider to select a ''physics coordinator''.
+
* Since time of approval of our KLF proposal, GlueX setting got new software and two new elements of basic equipment: DIRC and FCAL-II. Can we consider to select a ''physics coordinator''?
  
 
* On June 17th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_June_17,_2022].
 
* On June 17th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_June_17,_2022].
 +
 +
* We started to draft a document for the conceptual design of CPS for Hall D.

Latest revision as of 21:31, 26 June 2022

Attended: Moskov, Jim, Sean, and Igor. Mikhail is on shifts, Justin has family busines.

  • On May 24-26, GlueX Collaboration had a meeting [1]. Talks by Eugene and Tim mantioned a development for the KLF.
  • On May 27th, we had 5th KLF Collaboration meeting [2]. 30+ people attended our meeting. We have a productive discussion about a status of the project and future direction - what-to-do.
  • Since time of approval of our KLF proposal, GlueX setting got new software and two new elements of basic equipment: DIRC and FCAL-II. Can we consider to select a physics coordinator?
  • On June 17th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [3].
  • We started to draft a document for the conceptual design of CPS for Hall D.