Difference between revisions of "April 26th, 2017"
Jump to navigation
Jump to search
Line 2: | Line 2: | ||
− | * The recent draft of the KLF proposal [https://wiki.jlab.org/klproject/images/8/80/KLProposal_40.pdf]. | + | * The recent draft of the KLF proposal v40 [https://wiki.jlab.org/klproject/images/8/80/KLProposal_40.pdf]. |
+ | |||
+ | |||
+ | * There are several items left: | ||
+ | |||
+ | - update LQCD Sec. [Robert Edwards and Michael Doering] | ||
+ | |||
+ | - introduce MC for K-pi and statistics [Moskov]. | ||
+ | |||
+ | - update a neutron background subSec [Igor]. | ||
+ | |||
+ | - list of the new equipment and of the changes in the existing setup required [Eugene] | ||
+ | |||
+ | - general polishing [everybody]. | ||
Revision as of 08:35, 26 April 2017
Tentative Agenda [...]
- The recent draft of the KLF proposal v40 [1].
- There are several items left:
- update LQCD Sec. [Robert Edwards and Michael Doering]
- introduce MC for K-pi and statistics [Moskov].
- update a neutron background subSec [Igor].
- list of the new equipment and of the changes in the existing setup required [Eugene]
- general polishing [everybody].
- Avetik and Giessen group have here experience with Philips dSiPM [2], Ketek SiPM (now), and Orsay SAMPIC type of signal measurements. Also a few MCP-PMT from Hamamatsu, Photonis, and Budker institute might be available. All he can test on prototypes.
- Schedule for the PAC45 submission:
- May 1: Draft of the proposal will be posted internally to the GlueX Collaboration for discussion.
- May 15-17: We have to have a short presentation at the GlueX Collaboration meeting.
- May 22: Deadline to submit our KLF proposal to PAC45.