Difference between revisions of "April 26th, 2017"

From kl project
Jump to navigation Jump to search
Line 2: Line 2:
  
  
* The recent draft of the KLF proposal [https://wiki.jlab.org/klproject/images/8/80/KLProposal_40.pdf].
+
* The recent draft of the KLF proposal v40 [https://wiki.jlab.org/klproject/images/8/80/KLProposal_40.pdf].
 +
 
 +
 
 +
* There are several items left:
 +
 
 +
- update LQCD Sec. [Robert Edwards and Michael Doering]
 +
 
 +
- introduce MC for K-pi and statistics [Moskov].
 +
 
 +
- update a neutron background subSec [Igor].
 +
 
 +
- list of the new equipment and of the changes in the existing setup required [Eugene]
 +
 
 +
- general polishing [everybody].
  
  

Revision as of 08:35, 26 April 2017

Tentative Agenda [...]


  • The recent draft of the KLF proposal v40 [1].


  • There are several items left:

- update LQCD Sec. [Robert Edwards and Michael Doering]

- introduce MC for K-pi and statistics [Moskov].

- update a neutron background subSec [Igor].

- list of the new equipment and of the changes in the existing setup required [Eugene]

- general polishing [everybody].


  • Avetik and Giessen group have here experience with Philips dSiPM [2], Ketek SiPM (now), and Orsay SAMPIC type of signal measurements. Also a few MCP-PMT from Hamamatsu, Photonis, and Budker institute might be available. All he can test on prototypes.


  • Schedule for the PAC45 submission:

- May 1: Draft of the proposal will be posted internally to the GlueX Collaboration for discussion.

- May 15-17: We have to have a short presentation at the GlueX Collaboration meeting.

- May 22: Deadline to submit our KLF proposal to PAC45.