Tentative Agenda
+
Agenda [attended: Moskov, Justin, Marouen, Avetik, Kijun, Stuart, Mikhail, Mark, Simon and Igor
 +
(Nick is traveling and I did not recognize folks who are on phone from JLab)]
 +
 
 +
 
 +
* The recent draft of the KLF proposal v40 [https://wiki.jlab.org/klproject/images/8/80/KLProposal_40.pdf].
 +
 
 +
 
 +
* Recent study of Marouen [https://wiki.jlab.org/klproject/images/c/cb/Slide.pdf]
 +
 
 +
 
 +
* There are several items left:
 +
 
 +
- update LQCD Sec. [Robert Edwards and Michael Doering]
 +
 
 +
- introduce MC for K-pi and statistics [Marouen].
 +
 
 +
- update a neutron background subSec [Igor].
 +
 
 +
- list of the new equipment and of the changes in the existing setup required [Eugene]
 +
 
 +
- general polishing [everybody].
 +
 
 +
 
 +
* Avetik and Giessen group have here experience with Philips dSiPM [https://wiki.jlab.org/klproject/images/4/46/Avetik-Heidelberg-nachopenoffice.pdf], Ketek SiPM (now), and Orsay SAMPIC type of signal measurements. Also a few MCP-PMTs from Hamamatsu, Photonis, and Budker might be available. All he can test on prototypes.
 +
 
 +
 
 +
* Schedule for the PAC45 submission:
 +
 
 +
- May 1:  Draft of the proposal will be posted internally to the GlueX Collaboration for discussion.
 +
 
 +
- May 15-17: We have to have a short presentation at the GlueX Collaboration meeting.
 +
 
 +
- May 22: Deadline to submit our KLF proposal to PAC45.

Latest revision as of 09:47, 26 April 2017

Agenda [attended: Moskov, Justin, Marouen, Avetik, Kijun, Stuart, Mikhail, Mark, Simon and Igor (Nick is traveling and I did not recognize folks who are on phone from JLab)]


  • The recent draft of the KLF proposal v40 [1].


  • Recent study of Marouen [2]


  • There are several items left:

- update LQCD Sec. [Robert Edwards and Michael Doering]

- introduce MC for K-pi and statistics [Marouen].

- update a neutron background subSec [Igor].

- list of the new equipment and of the changes in the existing setup required [Eugene]

- general polishing [everybody].


  • Avetik and Giessen group have here experience with Philips dSiPM [3], Ketek SiPM (now), and Orsay SAMPIC type of signal measurements. Also a few MCP-PMTs from Hamamatsu, Photonis, and Budker might be available. All he can test on prototypes.


  • Schedule for the PAC45 submission:

- May 1: Draft of the proposal will be posted internally to the GlueX Collaboration for discussion.

- May 15-17: We have to have a short presentation at the GlueX Collaboration meeting.

- May 22: Deadline to submit our KLF proposal to PAC45.