Difference between revisions of "April 26th, 2017"

From kl project
Jump to navigation Jump to search
 
(9 intermediate revisions by the same user not shown)
Line 1: Line 1:
Tentative Agenda [...]
+
Agenda [attended: Moskov, Justin, Marouen, Avetik, Kijun, Stuart, Mikhail, Mark, Simon and Igor
 +
(Nick is traveling and I did not recognize folks who are on phone from JLab)]
  
  
* The recent draft of the KLF proposal [...].
+
* The recent draft of the KLF proposal v40 [https://wiki.jlab.org/klproject/images/8/80/KLProposal_40.pdf].
  
* Avetik foir Start Counter [...].
+
 
 +
* Recent study of Marouen [https://wiki.jlab.org/klproject/images/c/cb/Slide.pdf]
 +
 
 +
 
 +
* There are several items left:
 +
 
 +
- update LQCD Sec. [Robert Edwards and Michael Doering]
 +
 
 +
- introduce MC for K-pi and statistics [Marouen].
 +
 
 +
- update a neutron background subSec [Igor].
 +
 
 +
- list of the new equipment and of the changes in the existing setup required [Eugene]
 +
 
 +
- general polishing [everybody].
 +
 
 +
 
 +
* Avetik and Giessen group have here experience with Philips dSiPM [https://wiki.jlab.org/klproject/images/4/46/Avetik-Heidelberg-nachopenoffice.pdf], Ketek SiPM (now), and Orsay SAMPIC type of signal measurements. Also a few MCP-PMTs from Hamamatsu, Photonis, and Budker might be available. All he can test on prototypes.
  
  

Latest revision as of 10:47, 26 April 2017

Agenda [attended: Moskov, Justin, Marouen, Avetik, Kijun, Stuart, Mikhail, Mark, Simon and Igor (Nick is traveling and I did not recognize folks who are on phone from JLab)]


  • The recent draft of the KLF proposal v40 [1].


  • Recent study of Marouen [2]


  • There are several items left:

- update LQCD Sec. [Robert Edwards and Michael Doering]

- introduce MC for K-pi and statistics [Marouen].

- update a neutron background subSec [Igor].

- list of the new equipment and of the changes in the existing setup required [Eugene]

- general polishing [everybody].


  • Avetik and Giessen group have here experience with Philips dSiPM [3], Ketek SiPM (now), and Orsay SAMPIC type of signal measurements. Also a few MCP-PMTs from Hamamatsu, Photonis, and Budker might be available. All he can test on prototypes.


  • Schedule for the PAC45 submission:

- May 1: Draft of the proposal will be posted internally to the GlueX Collaboration for discussion.

- May 15-17: We have to have a short presentation at the GlueX Collaboration meeting.

- May 22: Deadline to submit our KLF proposal to PAC45.