Difference between revisions of "April 26th, 2017"
Jump to navigation
Jump to search
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | Agenda [attended: Moskov, Justin, Marouen, Avetik, Kijun, Stuart, Mikhail, Mark, Simon and Igor | |
+ | (Nick is traveling and I did not recognize folks who are on phone from JLab)] | ||
* The recent draft of the KLF proposal v40 [https://wiki.jlab.org/klproject/images/8/80/KLProposal_40.pdf]. | * The recent draft of the KLF proposal v40 [https://wiki.jlab.org/klproject/images/8/80/KLProposal_40.pdf]. | ||
+ | |||
+ | |||
+ | * Recent study of Marouen [https://wiki.jlab.org/klproject/images/c/cb/Slide.pdf] | ||
Line 18: | Line 22: | ||
− | * Avetik and Giessen group have here experience with Philips dSiPM [https://wiki.jlab.org/klproject/images/4/46/Avetik-Heidelberg-nachopenoffice.pdf], Ketek SiPM (now), and Orsay SAMPIC type of signal measurements. Also a few MCP- | + | * Avetik and Giessen group have here experience with Philips dSiPM [https://wiki.jlab.org/klproject/images/4/46/Avetik-Heidelberg-nachopenoffice.pdf], Ketek SiPM (now), and Orsay SAMPIC type of signal measurements. Also a few MCP-PMTs from Hamamatsu, Photonis, and Budker might be available. All he can test on prototypes. |
Latest revision as of 09:47, 26 April 2017
Agenda [attended: Moskov, Justin, Marouen, Avetik, Kijun, Stuart, Mikhail, Mark, Simon and Igor (Nick is traveling and I did not recognize folks who are on phone from JLab)]
- The recent draft of the KLF proposal v40 [1].
- Recent study of Marouen [2]
- There are several items left:
- update LQCD Sec. [Robert Edwards and Michael Doering]
- introduce MC for K-pi and statistics [Marouen].
- update a neutron background subSec [Igor].
- list of the new equipment and of the changes in the existing setup required [Eugene]
- general polishing [everybody].
- Avetik and Giessen group have here experience with Philips dSiPM [3], Ketek SiPM (now), and Orsay SAMPIC type of signal measurements. Also a few MCP-PMTs from Hamamatsu, Photonis, and Budker might be available. All he can test on prototypes.
- Schedule for the PAC45 submission:
- May 1: Draft of the proposal will be posted internally to the GlueX Collaboration for discussion.
- May 15-17: We have to have a short presentation at the GlueX Collaboration meeting.
- May 22: Deadline to submit our KLF proposal to PAC45.