Difference between revisions of "December 6th, 2022"

From kl project
Jump to navigation Jump to search
Line 17: Line 17:
 
:: [[media:magnet_study_opera_12_05_2022.pdf | Magnet studies with OPERA]] (''Hovanes'').
 
:: [[media:magnet_study_opera_12_05_2022.pdf | Magnet studies with OPERA]] (''Hovanes'').
  
* On December 5th, Patrizia sent us a Charge for ERR [https://wiki.jlab.org/klproject/images/c/cc/Charge_KLF_ERR_phase_I.pdf].
+
* On December 5th, Patrizia sent us a Charge for ERR [https://wiki.jlab.org/klproject/images/c/cc/Charge_KLF_ERR_phase_I.pdf Charge for ERR-I].
  
 
* On December 8th, we had a ''Hovanes'' KPT meeting for ERR [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_December_8,_2022].
 
* On December 8th, we had a ''Hovanes'' KPT meeting for ERR [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_December_8,_2022].

Revision as of 13:46, 5 December 2022

Attended: ... and Igor.

  • On November 28th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tagger vault with CPS [1].
Updates on conceptual design (Vitaly)
Temperature calculations (Tim)
Alternative model (Pavel)
Extra material to browse (Pavel)
Magnet studies with OPERA (Hovanes)
  • On December 2nd, Tanja Horn had a CPS meeting (main focus is CPS for Hall C, incuding stress/thermal calculations) [2].
  • On December 5th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tagger vault with CPS [3].
Temperature calculations (Tim).
Updates on conceptual design (Vitaly).
Alternative model (Pavel).
Magnet studies with OPERA (Hovanes).
  • On December 8th, we had a Hovanes KPT meeting for ERR [4].