The Agenda [attended 16 people: Moskov, Avetik, Chen, Franz, Justin, Lei, Mikhail, Nick, Paul, Volker, Kijun, Simon, Igor and three more people via phone]:
+
Agenda [attended 16 people: Moskov, Avetik, Chan, Franz, Justin, Lei, Mikhail, Nick, Paul, Volker, Kijun, Simon, Igor and three more people via phone]:
  
 
1) Our schedule for the proposal (back in time):
 
1) Our schedule for the proposal (back in time):
Line 18: Line 18:
  
 
4) Simulate a few KL-induced reactions in the LH2 target and evaluate the acceptance, resolutions, background etc.
 
4) Simulate a few KL-induced reactions in the LH2 target and evaluate the acceptance, resolutions, background etc.
Simulate the interactions of the KL and n in the material of the GlueX setup.
 
  
5) Calculate the spectrum (p,theta) of the KL and n coming from the Be target.
+
5) Simulate the interactions of the KL and n in the material of the GlueX setup.
  
6) For hyperon spectroscopy
+
6) Calculate the spectrum (p,theta) of the KL and n coming from the Be target.
 +
 
 +
7) Hyperon spectroscopy
  
 
-- ds/dO for KLp-->K+n (Mikhail).
 
-- ds/dO for KLp-->K+n (Mikhail).
Line 32: Line 33:
 
-- ds/dO for xxx ?
 
-- ds/dO for xxx ?
  
7) For meson spectroscopy (Volker).
+
8) Meson spectroscopy (Volker).
 +
 
 +
9) Strange meson physics (Lei).
 +
 
 +
10) CP-violation (Moskov).
 +
 
 +
11) Status of neutron background simulations (Igor).
  
8) For Strange meson physics (Lei).
+
12) Simulate the n-interaction in the LH2 target with the neutron flux will be reasonable.
  
9) For CP-violation (Moskov)
+
13) RedCon issues.
  
10) Status of neutron background simulations (Igor) [[https://halldweb.jlab.org/wiki/images/6/68/KL.pdf]]
+
14) Time resolution issues.
  
11) Simulate the n-interaction in the LH2 target with the neutron flux will be reasonable.
+
15) Start counter issues (Paul, Justin)
  
12) Schedule for the next meeting - in a month (January 4th, 2017)
+
16) Schedule for the next meeting - in a month (January 4th, 2017)

Latest revision as of 13:26, 4 January 2017

Agenda [attended 16 people: Moskov, Avetik, Chan, Franz, Justin, Lei, Mikhail, Nick, Paul, Volker, Kijun, Simon, Igor and three more people via phone]:

1) Our schedule for the proposal (back in time):

- We may expect that PAC will be scheduled for July.

- We have to submit our proposal 6 weeks in advance (May-June).

- It will probably take 4 weeks for the GlueX Collaboration to review (April-May).

- In March, we plan to ask Rolf for a technical review (Jim Napolitano's suggestion).

- GlueX Collab meeting is scheduled for Feb 16-18 and we have to talk about KL.

2) We have to make a conceptual design of the KL project which allows to estimate a cost of the KL (Jim Napolitano's suggestion). To do that we have to draw a Note and then ask Eugene to ask Tim to make it.

3) Put the right LH2 target and beamline into GlueX MC.

4) Simulate a few KL-induced reactions in the LH2 target and evaluate the acceptance, resolutions, background etc.

5) Simulate the interactions of the KL and n in the material of the GlueX setup.

6) Calculate the spectrum (p,theta) of the KL and n coming from the Be target.

7) Hyperon spectroscopy

-- ds/dO for KLp-->K+n (Mikhail).

-- ds/dO for KLp-->KSp (Mikhail).

-- ds/dO and Sigma for KLp-->K+Xi (Nick, Lei).

-- ds/dO for xxx ?

8) Meson spectroscopy (Volker).

9) Strange meson physics (Lei).

10) CP-violation (Moskov).

11) Status of neutron background simulations (Igor).

12) Simulate the n-interaction in the LH2 target with the neutron flux will be reasonable.

13) RedCon issues.

14) Time resolution issues.

15) Start counter issues (Paul, Justin)

16) Schedule for the next meeting - in a month (January 4th, 2017)