Difference between revisions of "June 28th, 2023"

From kl project
Jump to navigation Jump to search
Line 8: Line 8:
 
:* 128-ns status (''Moskov'')
 
:* 128-ns status (''Moskov'')
 
:* Engeneering work status (''Eugene'')
 
:* Engeneering work status (''Eugene'')
 +
 +
 +
* [https://wiki.jlab.org/klproject/images/f/f8/Conceptual_Design_of_Beryllium_Target_for_the_KLF_Project_%2823%29.pdf Conceptual design of KPT]
  
  
 
* On June 19th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_June_19,_2023].
 
* On June 19th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_June_19,_2023].

Revision as of 20:07, 14 June 2023

Attended: Moskov, ..., and Igor.

  • Agenda:
  • 7th KLF Collab meeting is scheduled for September 19 [1].
  • Our preparation for EER-I scheduled for the first week of August (Eugene).
  • CPS status (Hovanes)
  • KFM status (Mikhail)
  • 128-ns status (Moskov)
  • Engeneering work status (Eugene)



  • On June 19th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].