Difference between revisions of "July 28th, 2023"

From kl project
Jump to navigation Jump to search
Line 1: Line 1:
 
<b>Attended</b>: ''Moskov'', ...''Igor''.
 
<b>Attended</b>: ''Moskov'', ...''Igor''.
  
* On Aug 2nd, ERR-I is sceduled.  All details are in [].
+
* On Aug 2nd, ERR-I is sceduled.  All details are in [https://wiki.jlab.org/klproject/index.php/KLF_Phase_I_ERR].
  
  

Revision as of 11:50, 22 July 2023

Attended: Moskov, ...Igor.

  • On Aug 2nd, ERR-I is sceduled. All details are in [1].


  • On July 24th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].
  • Thermal analysis of the CPS absorber in ANSYS (Tim)
  • CPS presentation at ERR-1 (Hovanes)
  • CPS technical note (Hovanes, Pavel)