Difference between revisions of "July 28th, 2023"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
<b>Attended</b>: ''Moskov'', ...''Igor''. | <b>Attended</b>: ''Moskov'', ...''Igor''. | ||
− | * On Aug 2nd, ERR-I is sceduled. All details are in []. | + | * On Aug 2nd, ERR-I is sceduled. All details are in [https://wiki.jlab.org/klproject/index.php/KLF_Phase_I_ERR]. |
Revision as of 10:50, 22 July 2023
Attended: Moskov, ...Igor.
- On Aug 2nd, ERR-I is sceduled. All details are in [1].
- On July 24th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].
- Thermal analysis of the CPS absorber in ANSYS (Tim)
- CPS presentation at ERR-1 (Hovanes)
- CPS technical note (Hovanes, Pavel)