* On Aug 2nd, ERR-I is sceduled.  All details are in [https://wiki.jlab.org/klproject/index.php/KLF_Phase_I_ERR].
 
* On Aug 2nd, ERR-I is sceduled.  All details are in [https://wiki.jlab.org/klproject/index.php/KLF_Phase_I_ERR].
 +
 +
 +
* On July 25th, we had a ''Marco'' muBDX@KLF/CPS meeting disciss the following...
 +
:* Tonino will give a short presentation about the work he did in the old configuration and the integration in the new.
 +
:* We shall discuss:
 +
- options to move upstream the whole CPS
 +
- options to deflect 0.5 GeV - 5GeV muons on one side of the beamline:
 +
— 1) increasing the permanent magnet  Bdl or
 +
— 2) switching from a pure permanent  to a permanent/powerd magnet
 +
— 3) adding a further magnet downstream
 +
- options to shield the detector set up
 +
- weight, available clearance, of the two dipoles necessary to determine incoming/scattered muon momentum
 +
- other possible issues
 +
- coordination with KLF Coll and Hall-D team
  
  
 
* On July 24th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_July_24,_2023].
 
* On July 24th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_July_24,_2023].
 
:* Thermal analysis of the CPS absorber in ANSYS (''Tim'')
 
:* Thermal analysis of the CPS absorber in ANSYS (''Tim'')
:* CPS presentation at ERR-1 (''Hovanes'')
+
:* [[media:cps_design_status_err1.pdf | CPS presentation at ERR-1]] (''Hovanes'')
 
:* [[media:CPS_design_for_HallD_ERR1.pdf | CPS technical note]] (''Hovanes'', ''Pavel'')
 
:* [[media:CPS_design_for_HallD_ERR1.pdf | CPS technical note]] (''Hovanes'', ''Pavel'')

Revision as of 18:37, 24 July 2023

Attended: Moskov, ...Igor.

  • On Aug 2nd, ERR-I is sceduled. All details are in [1].


  • On July 25th, we had a Marco muBDX@KLF/CPS meeting disciss the following...
  • Tonino will give a short presentation about the work he did in the old configuration and the integration in the new.
  • We shall discuss:

- options to move upstream the whole CPS - options to deflect 0.5 GeV - 5GeV muons on one side of the beamline: — 1) increasing the permanent magnet Bdl or — 2) switching from a pure permanent to a permanent/powerd magnet — 3) adding a further magnet downstream - options to shield the detector set up - weight, available clearance, of the two dipoles necessary to determine incoming/scattered muon momentum - other possible issues - coordination with KLF Coll and Hall-D team


  • On July 24th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].