Difference between revisions of "July 28th, 2023"
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
:* Tonino will give a short presentation about the work he did in the old configuration and the integration in the new. | :* Tonino will give a short presentation about the work he did in the old configuration and the integration in the new. | ||
:* We shall discuss: | :* We shall discuss: | ||
− | - options to move upstream the whole CPS | + | :- options to move upstream the whole CPS |
− | - options to deflect 0.5 GeV - 5GeV muons on one side of the beamline: | + | :- options to deflect 0.5 GeV - 5GeV muons on one side of the beamline: |
− | — 1) increasing the permanent magnet Bdl or | + | :— 1) increasing the permanent magnet Bdl or |
− | — 2) switching from a pure permanent to a permanent/powerd magnet | + | :— 2) switching from a pure permanent to a permanent/powerd magnet |
− | — 3) adding a further magnet downstream | + | :— 3) adding a further magnet downstream |
− | - options to shield the detector set up | + | :- options to shield the detector set up |
− | - weight, available clearance, of the two dipoles necessary to determine incoming/scattered muon momentum | + | :- weight, available clearance, of the two dipoles necessary to determine incoming/scattered muon momentum |
− | - other possible issues | + | :- other possible issues |
− | - coordination with KLF Coll and Hall-D team | + | :- coordination with KLF Coll and Hall-D team |
Revision as of 18:38, 24 July 2023
Attended: Moskov, ...Igor.
- On Aug 2nd, ERR-I is sceduled. All details are in [1].
- On July 25th, we had a Marco muBDX@KLF/CPS meeting disciss the following...
- Tonino will give a short presentation about the work he did in the old configuration and the integration in the new.
- We shall discuss:
- - options to move upstream the whole CPS
- - options to deflect 0.5 GeV - 5GeV muons on one side of the beamline:
- — 1) increasing the permanent magnet Bdl or
- — 2) switching from a pure permanent to a permanent/powerd magnet
- — 3) adding a further magnet downstream
- - options to shield the detector set up
- - weight, available clearance, of the two dipoles necessary to determine incoming/scattered muon momentum
- - other possible issues
- - coordination with KLF Coll and Hall-D team
- On July 24th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].
- Thermal analysis of the CPS absorber in ANSYS (Tim)
- CPS presentation at ERR-1 (Hovanes)
- CPS technical note (Hovanes, Pavel)