Difference between revisions of "July 28th, 2023"

From kl project
Jump to navigation Jump to search
Line 7: Line 7:
 
:* Tonino will give a short presentation about the work he did in the old configuration and the integration in the new.
 
:* Tonino will give a short presentation about the work he did in the old configuration and the integration in the new.
 
:* We shall discuss:
 
:* We shall discuss:
:- options to move upstream the whole CPS
+
:** options to move upstream the whole CPS
:- options to deflect 0.5 GeV - 5GeV muons on one side of the beamline:
+
:** options to deflect 0.5 GeV - 5GeV muons on one side of the beamline:
:1) increasing the permanent magnet  Bdl or
+
:** 1) increasing the permanent magnet  Bdl or
 
:— 2) switching from a pure permanent  to a permanent/powerd magnet
 
:— 2) switching from a pure permanent  to a permanent/powerd magnet
 
:— 3) adding a further magnet downstream
 
:— 3) adding a further magnet downstream
 
:- options to shield the detector set up
 
:- options to shield the detector set up
:- weight, available clearance, of the two dipoles necessary to determine incoming/scattered muon momentum
+
:** weight, available clearance, of the two dipoles necessary to determine incoming/scattered muon momentum
:- other possible issues  
+
:** other possible issues  
:- coordination with KLF Coll and Hall-D team
+
:** coordination with KLF Coll and Hall-D team
  
  

Revision as of 18:39, 24 July 2023

Attended: Moskov, ...Igor.

  • On Aug 2nd, ERR-I is sceduled. All details are in [1].


  • On July 25th, we had a Marco muBDX@KLF/CPS meeting disciss the following...
  • Tonino will give a short presentation about the work he did in the old configuration and the integration in the new.
  • We shall discuss:
    • options to move upstream the whole CPS
    • options to deflect 0.5 GeV - 5GeV muons on one side of the beamline:
    • 1) increasing the permanent magnet Bdl or
— 2) switching from a pure permanent to a permanent/powerd magnet
— 3) adding a further magnet downstream
- options to shield the detector set up
    • weight, available clearance, of the two dipoles necessary to determine incoming/scattered muon momentum
    • other possible issues
    • coordination with KLF Coll and Hall-D team


  • On July 24th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].