* Final design of Be-target assembly [https://wiki.jlab.org/klproject/images/9/97/Be1.pdf].The weight of the Be-target assembly is 14.5 ton.
 
* Final design of Be-target assembly [https://wiki.jlab.org/klproject/images/9/97/Be1.pdf].The weight of the Be-target assembly is 14.5 ton.
 +
Preliminary results show that we are under RadCon control [https://wiki.jlab.org/klproject/images/b/be/Summary_%2814%29.xlsx]. We are still waiting for Tim about a cooling system

Revision as of 18:54, 6 February 2018

  • Attended:


  • Just a reminder: We will have PKI2018 Workshop, Feb 14-15 [1]
  • KL Flux Monitor: Mikhail sent KL Flux Memo to Eugene [2]
  • CFS: Tanja posted a draft of the NPS/CPS 2018 Action Items: [3].
  • Sc & cryotarget: A week ago, Justin, Eric, Chris, and Igor met and discuss a SC and LH2/LD2 cryotarget configuration. The bottom line is that the cryotarget will have 6 cm in diameter and 40 cm length and it will fit a SC scattering chamber. The cryotarget location is in the center of the GlueX detector.There is a minor question regarding a production angle for different particles for different reactions which somehow depends on the cryotarget location.
  • KL beam: Ilja made MC for KL beam and he promised to provide a geometrical profile (size and angle) of KL beam on the cryotarget. The size of the KL beam is much broader than the size of the diameter of the cryotarget.
  • Final design of Be-target assembly [4].The weight of the Be-target assembly is 14.5 ton.

Preliminary results show that we are under RadCon control [5]. We are still waiting for Tim about a cooling system