Difference between revisions of "KLF beamline meeting - May 29, 2024"

From kl project
Jump to navigation Jump to search
Line 5: Line 5:
 
*; Progress of CPS design (Tim, Pavel)
 
*; Progress of CPS design (Tim, Pavel)
  
*; New design, construction, and installation schedule estimates (Tim)
+
*; [[media:KLONG_2026instl_No_MRI.pdf | KLONG Installation Schedule 2026 with no MRI Magnet]] New design, construction, and installation schedule estimates (Tim)
  
 
*; Space at the lab (Tim, Eugene)
 
*; Space at the lab (Tim, Eugene)

Revision as of 09:17, 29 May 2024

Agenda

  • Announcements
  • Progress of CPS design (Tim, Pavel)
  • Space at the lab (Tim, Eugene)
  • Recommendation #4 from ERR-1 (Moskov)
    Results of the studies
    Statement regarding the studies of KLF compatibility with MOLLER
  • Recommendation #5 from ERR-1 (Tim)
    Results of the studies
    Statement regarding thermal cycling of the targets receiving >1 KW power.
  • Any other business

Minutes

Present: Mikhail, Igor