Difference between revisions of "KLF beamline meeting - May 29, 2024"

From kl project
Jump to navigation Jump to search
Line 11: Line 11:
  
 
*; Space at the lab (Tim, Eugene)
 
*; Space at the lab (Tim, Eugene)
 +
 +
**; Need 700 sq ft general indoor storage on or off site
 +
**; 200 sq ft in ESB
 +
**; Additional 150 sq ft in lead shed
  
 
*; Recommendation #4 from ERR-1 (Moskov)
 
*; Recommendation #4 from ERR-1 (Moskov)

Revision as of 09:28, 29 May 2024

Agenda

  • Announcements
  • Progress of CPS design (Tim, Pavel)
  • New design, construction, and installation schedule estimates (Tim)
  • Space at the lab (Tim, Eugene)
    • Need 700 sq ft general indoor storage on or off site
      200 sq ft in ESB
      Additional 150 sq ft in lead shed
  • Recommendation #4 from ERR-1 (Moskov)
    Results of the studies
    Statement regarding the studies of KLF compatibility with MOLLER
  • Recommendation #5 from ERR-1 (Tim)
    Results of the studies
    Statement regarding thermal cycling of the targets receiving >1 KW power.
  • Any other business

Minutes

Present: Mikhail, Igor