Line 13: | Line 13: | ||
**; Need 700 sq ft general indoor storage on or off site | **; Need 700 sq ft general indoor storage on or off site | ||
− | **; 200 sq ft in ESB | + | **; 200 sq ft in ESB (KFM detector check out) |
**; Additional 150 sq ft in lead shed | **; Additional 150 sq ft in lead shed | ||
+ | **; Assume MRI magnet comes directly to hall when available | ||
*; Recommendation #4 from ERR-1 (Moskov) | *; Recommendation #4 from ERR-1 (Moskov) |
Revision as of 09:29, 29 May 2024
Agenda
- Announcements
- Progress of CPS design (Tim, Pavel)
- New design, construction, and installation schedule estimates (Tim)
- Space at the lab (Tim, Eugene)
- Need 700 sq ft general indoor storage on or off site
- 200 sq ft in ESB (KFM detector check out)
- Additional 150 sq ft in lead shed
- Assume MRI magnet comes directly to hall when available
- Recommendation #4 from ERR-1 (Moskov)
- Results of the studies
- Statement regarding the studies of KLF compatibility with MOLLER
- Recommendation #5 from ERR-1 (Tim)
- Results of the studies
- Statement regarding thermal cycling of the targets receiving >1 KW power.
- Any other business
Minutes
Present: Mikhail, Igor