Difference between revisions of "February 21th, 2018"

From kl project
Jump to navigation Jump to search
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
* Attended:
+
* Attended: Moskov, Justin, Mark, Avetik, and Igor. Mikhail and Marouen are traveling while Nick is busy with FT at CLAS12.
  
 
* We had the PKI2018 Workshop, Feb 14-15 [https://www.jlab.org/conferences/pki2018/].  All slides are on the web. It gives us a good contribution to the KLF proposal.
 
* We had the PKI2018 Workshop, Feb 14-15 [https://www.jlab.org/conferences/pki2018/].  All slides are on the web. It gives us a good contribution to the KLF proposal.
  
*
+
* The conceptual design of the Be-target assembly is done. Neutron and gamma background are under the RadCon control. All details are in the current vesion08 of the proposal. The engineering design is in order.[https://wiki.jlab.org/klproject/images/e/e2/KLProposal_46_08.pdf]
  
 
* After March 13th, we will have more news about a status of the design of CPS for Hall C which we plan to use for Hall D.
 
* After March 13th, we will have more news about a status of the design of CPS for Hall C which we plan to use for Hall D.
 +
 +
* The conceptual design of the monitor flux by the Edinburgh team is in progress. We hope to have news by the next meeting.
 +
 +
* Cesar is still working to develop a code for PWA and start to work with quasi-data. That is important contribution to the proposal.
 +
 +
* Marouen left the country for a renewal a working visa.  He will be back in a month or so. ''Jose Pelaez'' has a code which will allow to accept quasi-data for pion-kaon interaction.  Again, that is important contribution to the proposal.

Latest revision as of 10:26, 7 March 2018

  • Attended: Moskov, Justin, Mark, Avetik, and Igor. Mikhail and Marouen are traveling while Nick is busy with FT at CLAS12.
  • We had the PKI2018 Workshop, Feb 14-15 [1]. All slides are on the web. It gives us a good contribution to the KLF proposal.
  • The conceptual design of the Be-target assembly is done. Neutron and gamma background are under the RadCon control. All details are in the current vesion08 of the proposal. The engineering design is in order.[2]
  • After March 13th, we will have more news about a status of the design of CPS for Hall C which we plan to use for Hall D.
  • The conceptual design of the monitor flux by the Edinburgh team is in progress. We hope to have news by the next meeting.
  • Cesar is still working to develop a code for PWA and start to work with quasi-data. That is important contribution to the proposal.
  • Marouen left the country for a renewal a working visa. He will be back in a month or so. Jose Pelaez has a code which will allow to accept quasi-data for pion-kaon interaction. Again, that is important contribution to the proposal.