Difference between revisions of "KLF beamline meeting - May 29, 2024"

From kl project
Jump to navigation Jump to search
Line 11: Line 11:
  
 
*; Space at the lab (Tim, Eugene)
 
*; Space at the lab (Tim, Eugene)
 
 
**; Need 700 sq ft general indoor storage on or off site
 
**; Need 700 sq ft general indoor storage on or off site
 
**; 200 sq ft in ESB (KFM detector check out)
 
**; 200 sq ft in ESB (KFM detector check out)

Revision as of 09:39, 29 May 2024

Agenda

  • Announcements
  • Space at the lab (Tim, Eugene)
    • Need 700 sq ft general indoor storage on or off site
      200 sq ft in ESB (KFM detector check out)
      Additional 150 sq ft in lead shed
      Assume MRI magnet comes directly to hall when available
  • Recommendation #4 from ERR-1 (Moskov)
    Results of the studies
    Statement regarding the studies of KLF compatibility with MOLLER
  • Recommendation #5 from ERR-1 (Tim)
    Results of the studies
    Statement regarding thermal cycling of the targets receiving >1 KW power.
  • Any other business

Minutes

Present: Mikhail, Igor