Difference between revisions of "KLF beamline meeting - May 29, 2024"
Jump to navigation
Jump to search
(→Agenda) |
|||
Line 9: | Line 9: | ||
*; New design, construction, and installation schedule estimates (Tim) | *; New design, construction, and installation schedule estimates (Tim) | ||
**; [[media:KLONG_2026instl_No_MRI.pdf | KLONG Installation Schedule 2026 with no MRI Magnet]] | **; [[media:KLONG_2026instl_No_MRI.pdf | KLONG Installation Schedule 2026 with no MRI Magnet]] | ||
− | **; [[media: | + | **; [[media:KLONG_2025instl_MRI_v2.pdf | KLONG Installation Schedule 2025 with MRI Magnet]] |
*; Space at the lab (Tim, Eugene) | *; Space at the lab (Tim, Eugene) |
Revision as of 12:23, 29 May 2024
Agenda
- Announcements
- Progress of CPS design (Tim, Pavel)
- New design, construction, and installation schedule estimates (Tim)
- Space at the lab (Tim, Eugene)
- Need 700 sq ft general indoor storage on or off site
- 200 sq ft in ESB (KFM detector check out)
- Additional 150 sq ft in lead shed
- Assume MRI magnet comes directly to hall when available
- Recommendation #4 from ERR-1 (Moskov)
- Results of the studies
- Statement regarding the studies of KLF compatibility with MOLLER.
- On May 24, Moskov reported that accelerator folks did not have a time to check a situation with Moeller vs KLF in May and will do that in November.
- Recommendation #5 from ERR-1 (Tim)
- Results of the studies
- Statement regarding thermal cycling of the targets receiving >1 KW power.
- Any other business.
- On the next meeting, Ilya will report the KL rate from Be-target extracted from SRC measurements.
- Mikhail reported that KFM parts are moving from Juelich to JLab and will be ready for installation.
Minutes
Present: Mikhail, Tim, Edy, Pavel, Eugene, Marshall, Hovanes, Eduard, Vitaly, Beni, P.D., Igor