Difference between revisions of "KLF beamline meeting - October 17, 2024"

From kl project
Jump to navigation Jump to search
Line 3: Line 3:
 
*; Announcements  
 
*; Announcements  
  
*; Beam tests in 2025 and beam bleed-through (Riad, Edy)  
+
*; Beam tests in 2025 and beam bleed-through (Riad, Edy)
 +
# MOLLER related Beam Tests: (Note laser is back to 249.5 MHz, need to switch to low-rep laser (one shift))
 +
## Study photocathode effects from KLong beam
 +
## Deliver Hall D Low-rep Rate and High Bunch Charge Beam to Hall C
 +
#
  
 
*; FLUKA simulations (Pavel)
 
*; FLUKA simulations (Pavel)

Revision as of 08:28, 17 October 2024

Agenda

  • Announcements
  • Beam tests in 2025 and beam bleed-through (Riad, Edy)
  1. MOLLER related Beam Tests: (Note laser is back to 249.5 MHz, need to switch to low-rep laser (one shift))
    1. Study photocathode effects from KLong beam
    2. Deliver Hall D Low-rep Rate and High Bunch Charge Beam to Hall C
  • FLUKA simulations (Pavel)
  • Updates from GEANT4 simulations (Richard)
  • Engineering update (Tim)
  • Any other business

Minutes

Present: