Difference between revisions of "KLF beamline meeting - October 17, 2024"

From kl project
Jump to navigation Jump to search
Line 4: Line 4:
  
 
*; Beam tests in 2025 and beam bleed-through (Riad, Edy)
 
*; Beam tests in 2025 and beam bleed-through (Riad, Edy)
# MOLLER related Beam Tests: (Note: laser is back to 249.5 MHz, need to switch to low-rep laser (one shift))
+
# MOLLER related Beam Tests: (Note: laser is back to 249.5 MHz, need to switch to low-rep laser (takes one shift))
 
## Study photocathode effects from KLong beam
 
## Study photocathode effects from KLong beam
 
## Deliver Hall D Low-rep Rate and High Bunch Charge Beam to Hall  
 
## Deliver Hall D Low-rep Rate and High Bunch Charge Beam to Hall  

Revision as of 08:30, 17 October 2024

Agenda

  • Announcements
  • Beam tests in 2025 and beam bleed-through (Riad, Edy)
  1. MOLLER related Beam Tests: (Note: laser is back to 249.5 MHz, need to switch to low-rep laser (takes one shift))
    1. Study photocathode effects from KLong beam
    2. Deliver Hall D Low-rep Rate and High Bunch Charge Beam to Hall
  2. Hall D Bleed-through:
  • FLUKA simulations (Pavel)
  • Updates from GEANT4 simulations (Richard)
  • Engineering update (Tim)
  • Any other business

Minutes

Present: