Difference between revisions of "KLF Beamline"

From kl project
Jump to navigation Jump to search
 
(25 intermediate revisions by 2 users not shown)
Line 2: Line 2:
 
= Beamline Meetings =  
 
= Beamline Meetings =  
  
Bi-weekly remote Zoom meetings (every two weeks) on Wednesdays at 11:00am  
+
Bi-weekly remote Zoom meetings (every two weeks) on Fridays at 10:00am  
  
 
=== Meetings in 2024 ===
 
=== Meetings in 2024 ===
  
 +
* [[KLF beamline meeting - November 21, 2024]]
 +
* [[KLF beamline meeting - November 14, 2024]]
 +
* [[KLF beamline meeting - November 7, 2024]]
 +
* [[KLF beamline meeting - October 31, 2024]]
 +
* [[KLF beamline meeting - October 24, 2024]]
 +
* [[KLF beamline meeting - October 17, 2024]]
 +
* [[KLF beamline meeting - October 10, 2024]]
 +
* [[KLF beamline meeting - October 3, 2024]]
 +
* [[KLF beamline meeting - September 26, 2024]]
 +
* [[KLF beamline meeting - September 19, 2024]]
 +
* [[KLF beamline meeting - September 6, 2024]]
 +
* [[KLF beamline meeting - August 23, 2024]]
 +
* [[KLF beamline meeting - August 9, 2024]]
 +
* [[KLF beamline meeting - July  26, 2024]]
 +
* [[KLF beamline meeting - July  12, 2024]]
 +
* [[KLF beamline meeting - June  28, 2024]]
 +
* [[KLF beamline meeting - June  14, 2024]]
 
* [[KLF beamline meeting - May  29, 2024]]
 
* [[KLF beamline meeting - May  29, 2024]]
 
* [[KLF beamline meeting - May    1, 2024]]
 
* [[KLF beamline meeting - May    1, 2024]]
Line 23: Line 40:
 
* [[Kaon Flux Monitor (KFM)]]
 
* [[Kaon Flux Monitor (KFM)]]
  
 +
 +
= Drawings =
 +
 +
[[media:KPT_Collimator_cave_layout.pdf | Collimator Cave engineering drawing showing the overview of the beamline and the KPT design]]
  
 
= Requirements for KLF beam =  
 
= Requirements for KLF beam =  
Line 40: Line 61:
 
|-  
 
|-  
 
| Beam excursion limits in FSD    ||  align=center  | Δ<sub>x,y</sub> ≥ 1 mm                                        ||  align=center  |  Δ<sub>x,y</sub> ≥ 1 cm
 
| Beam excursion limits in FSD    ||  align=center  | Δ<sub>x,y</sub> ≥ 1 mm                                        ||  align=center  |  Δ<sub>x,y</sub> ≥ 1 cm
 +
|-
 +
| Bleedthrough from wrong bunches  ||  align=center  | Specs undefined                                              ||  align=center  |  N/A
 
|}
 
|}

Latest revision as of 21:19, 19 November 2024

Beamline Meetings

Bi-weekly remote Zoom meetings (every two weeks) on Fridays at 10:00am

Meetings in 2024

Join ZoomGov Meeting
https://jlab-org.zoomgov.com/j/1606674688?pwd=b3dnTzJWVEtxZExGRnFoY29PSGkxQT09

Meeting ID: 160 667 4688
Passcode: 709878

Pages for the KLF new beamline components


Drawings

Collimator Cave engineering drawing showing the overview of the beamline and the KPT design

Requirements for KLF beam

Table: KLF electron beam specifications
Beam Paramater @ CPS radiator @ KPT entrance
Beam current 50 nA ≤ IB ≤ 5 μA N/A
Beam spot size σxy = 1.2 mm, (0.8 mm ≤ σx,y ≤ 1.5 mm) σx,y ≤ 1 cm
Beam position stability (@ 1 Hz) σx,y ≤ 0.2 mm σx,y ≤ 2 mm
Beam halo (halo-to-peak) < 10−4 at r ≥ 5σx,y N/A
Beam excursion limits in FSD Δx,y ≥ 1 mm Δx,y ≥ 1 cm
Bleedthrough from wrong bunches Specs undefined N/A