Difference between revisions of "August 24th, 2021"

From kl project
Jump to navigation Jump to search
 
Line 2: Line 2:
  
 
* On August 19th, we had ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly [https://halldweb.jlab.org/wiki/index.php/August_19,_2021_KLONG_Design_Meeting]
 
* On August 19th, we had ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly [https://halldweb.jlab.org/wiki/index.php/August_19,_2021_KLONG_Design_Meeting]
 +
 +
* On September 2nd, we had ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly [https://halldweb.jlab.org/wiki/index.php/September_2,_2021_KLONG_Design_Meeting#Meeting_Time_and_Place]

Latest revision as of 12:03, 2 September 2021

Attended: Sean, Moskov, Mikhail, Hovanes, Justin, and Igor.

  • On August 19th, we had Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly [1]
  • On September 2nd, we had Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly [2]