Difference between revisions of "KLF beamline meeting - August 9, 2024"

From kl project
Jump to navigation Jump to search
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
*; Announcements  
 
*; Announcements  
  
*; Beam requirements for detector calibrations (Sean, Mikhail)
+
*; KFM update (Mikhail)
 +
 
 +
*; Beam for detector calibrations (Sean, Mikhail, Igal)
  
 
*; Updates on CPS simulations (Pavel)
 
*; Updates on CPS simulations (Pavel)
 +
:* Low intensity photon beam from CPS
  
 
*; CPS, KPT, and cryo-target design progress (Tim)
 
*; CPS, KPT, and cryo-target design progress (Tim)
 
+
:* CPS absorber prototype tests
*; KFM update (Mikhail)
+
:* CPS magnet procurement
 +
:* KPT tungsten material density
  
 
*; Any other business
 
*; Any other business
 
  
 
= Minutes =
 
= Minutes =

Latest revision as of 09:58, 7 August 2024

Agenda

  • Announcements
  • KFM update (Mikhail)
  • Beam for detector calibrations (Sean, Mikhail, Igal)
  • Updates on CPS simulations (Pavel)
  • Low intensity photon beam from CPS
  • CPS, KPT, and cryo-target design progress (Tim)
  • CPS absorber prototype tests
  • CPS magnet procurement
  • KPT tungsten material density
  • Any other business

Minutes

Present: