Attended: Igor.

  • Should we have the 3rd KLF Collab meeting on May 11th or so?


  • KLF_Analysis_ Report [1].
  • New_Equipment [2].
  • Potential timeline for the different stages of the design, construction, and installation of the KL beamline [3].
  • Cover_Letter [].