Difference between revisions of "August 24th, 2021"

From kl project
Jump to navigation Jump to search
Line 1: Line 1:
  
  
* On August 12th, we had ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly []
+
* On August 19th, we had ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly [https://halldweb.jlab.org/wiki/index.php/August_19,_2021_KLONG_Design_Meeting]
* On August 26th, we had ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly []
 

Revision as of 08:44, 22 August 2021


  • On August 19th, we had Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly [1]