Line 2: | Line 2: | ||
* On August 19th, we had ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly [https://halldweb.jlab.org/wiki/index.php/August_19,_2021_KLONG_Design_Meeting] | * On August 19th, we had ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly [https://halldweb.jlab.org/wiki/index.php/August_19,_2021_KLONG_Design_Meeting] | ||
+ | |||
+ | * On September 2nd, we had ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly [https://halldweb.jlab.org/wiki/index.php/September_2,_2021_KLONG_Design_Meeting#Meeting_Time_and_Place] |
Latest revision as of 12:03, 2 September 2021
Attended: Sean, Moskov, Mikhail, Hovanes, Justin, and Igor.
- On August 19th, we had Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly [1]
- On September 2nd, we had Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly [2]