* On February 17th, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/February_17,_2022_KLONG_Phase_II_Design_Meeting#Requirements_and_things_to_finalize] | * On February 17th, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/February_17,_2022_KLONG_Phase_II_Design_Meeting#Requirements_and_things_to_finalize] | ||
+ | |||
+ | * There are several coming meetings: [https://indico.jlab.org/event/498/ CPHI2022, March 7-12], [], [], [] |
Revision as of 11:45, 24 February 2022
Attended: and Igor.
- On February 16th Gabi gave a talk for a status of the CPS for Hall C [1]
- On February 17th, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [2]
- There are several coming meetings: CPHI2022, March 7-12, [], [], []