* On March 3rd, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/March_03,_2022_KLONG_Phase_II_Design_Meeting] | * On March 3rd, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/March_03,_2022_KLONG_Phase_II_Design_Meeting] | ||
− | * In particular, Vitaly performed simulations for CPS using FLUKA [] | + | * In particular, Vitaly performed simulations for CPS using FLUKA [https://wiki.jlab.org/klproject/images/f/fe/BaturinMarch22.pptx] |