Difference between revisions of "March 28th, 2022"

From kl project
Jump to navigation Jump to search
Line 6: Line 6:
 
* In particular, ''Vitaly'' performed simulations for CPS using FLUKA and reported on ''Tim's'' meeting [https://wiki.jlab.org/klproject/images/f/fe/BaturinMarch22.pptx]
 
* In particular, ''Vitaly'' performed simulations for CPS using FLUKA and reported on ''Tim's'' meeting [https://wiki.jlab.org/klproject/images/f/fe/BaturinMarch22.pptx]
  
* On March 11th, we had a ''Hovanes''' meeting for a development of the engineering design of the Tiger hall with CPS []
+
* On March 11th, we had a ''Hovanes''' meeting for a development of the engineering design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_March_11,_2022]

Revision as of 10:24, 11 March 2022

Attended: and Igor.


  • On March 3rd, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [1]
  • In particular, Vitaly performed simulations for CPS using FLUKA and reported on Tim's meeting [2]
  • On March 11th, we had a Hovanes' meeting for a development of the engineering design of the Tiger hall with CPS [3]