Difference between revisions of "August 2nd, 2022"

From kl project
Jump to navigation Jump to search
Line 7: Line 7:
 
* On July 11th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_July_11,_2022].
 
* On July 11th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_July_11,_2022].
  
* On July 25th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_July_25,_2022].
+
* On July 25th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_July_25,_2022]. Update on conceptual design (''Vitaly'') and Temperature map calculations (''Tim'')

Revision as of 07:26, 25 July 2022

Attended: ... and Igor.


  • On July 8th, Tanja Horn had a CPS meeting (main focus is CPS for Hall C)[1].
  • On July 11th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [2].
  • On July 25th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [3]. Update on conceptual design (Vitaly) and Temperature map calculations (Tim)