Difference between revisions of "November 15th, 2022"

From kl project
Jump to navigation Jump to search
Line 3: Line 3:
 
* On October 3rd, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_October_3,_2022]. [[ | Temperature map calculations]] (''Tim''). [[ | Updates on the conceptual design]] (''Vitaly'').
 
* On October 3rd, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_October_3,_2022]. [[ | Temperature map calculations]] (''Tim''). [[ | Updates on the conceptual design]] (''Vitaly'').
  
* Thursday, November 10th, we had the 6th KLF Collaboration meeting. The agenda is in [https://wiki.jlab.org/klproject/index.php/November,_3rd_2022].
+
* Thursday, November 10th, we had the 6th KLF Collaboration meeting. The agenda is at [https://wiki.jlab.org/klproject/index.php/November,_10th_2022].

Revision as of 14:05, 2 October 2022

Attended: ..., and Igor.

  • On October 3rd, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [1]. [[ | Temperature map calculations]] (Tim). [[ | Updates on the conceptual design]] (Vitaly).
  • Thursday, November 10th, we had the 6th KLF Collaboration meeting. The agenda is at [2].