Difference between revisions of "November 15th, 2022"
Jump to navigation
Jump to search
Line 2: | Line 2: | ||
* On October 3rd, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_October_3,_2022]. Temperature map calculations (''Tim''). Updates on the conceptual design (''Vitaly''). | * On October 3rd, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_October_3,_2022]. Temperature map calculations (''Tim''). Updates on the conceptual design (''Vitaly''). | ||
+ | |||
+ | * On October 17th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_October_17,_2022]. Temperature map calculations (''Tim''). Updates on the conceptual design (''Vitaly''). | ||
* Thursday, November 10th, we had the 6th KLF Collaboration meeting. The agenda is at [https://wiki.jlab.org/klproject/index.php/November,_10th_2022]. | * Thursday, November 10th, we had the 6th KLF Collaboration meeting. The agenda is at [https://wiki.jlab.org/klproject/index.php/November,_10th_2022]. |
Revision as of 08:36, 16 October 2022
Attended: ..., and Igor.
- On October 3rd, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [1]. Temperature map calculations (Tim). Updates on the conceptual design (Vitaly).
- On October 17th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [2]. Temperature map calculations (Tim). Updates on the conceptual design (Vitaly).
- Thursday, November 10th, we had the 6th KLF Collaboration meeting. The agenda is at [3].