Difference between revisions of "KLF Phase I ERR"

From kl project
Jump to navigation Jump to search
Line 32: Line 32:
 
:* <font color=blue>''Igor Strakovsky'' and ''Vitaly Baturin''</font> [https://wiki.jlab.org/klproject/images/9/92/KLF2023b_Igor.pdf KPT: Conceptual design and Radiation factors:] #5,6,7,12.
 
:* <font color=blue>''Igor Strakovsky'' and ''Vitaly Baturin''</font> [https://wiki.jlab.org/klproject/images/9/92/KLF2023b_Igor.pdf KPT: Conceptual design and Radiation factors:] #5,6,7,12.
 
:* <font color=blue>''Mikhail Bashkanov''</font> [https://wiki.jlab.org/klproject/images/5/56/KLF_2023_Feb_v1.pdf KFM: Status Report:] #8,12.
 
:* <font color=blue>''Mikhail Bashkanov''</font> [https://wiki.jlab.org/klproject/images/5/56/KLF_2023_Feb_v1.pdf KFM: Status Report:] #8,12.
:* <font color=blue>''Timothy Whitlatch''</font> [CPS and KPT: Engineering design, Cooling, and Cost estimation:] #2,3,5,6,12.
+
:* <font color=blue>''Timothy Whitlatch''</font> [CPS and KPT: Engineering design, Cooling, and Cost estimation:] #2,3,5,6,12,13.
 
:* <font color=blue>''Geoffrey Krafft''</font> [Beam bunch space:] #9,10,11.
 
:* <font color=blue>''Geoffrey Krafft''</font> [Beam bunch space:] #9,10,11.
  

Revision as of 07:40, 28 June 2023

KLF Phase I ERR (August 2nd, 2023)

KLF Proposal

Charge

Committee

  • Chad Bailey (Environment, Safety, & Health)
  • Dan Carman (Kaon Flux Detector)
  • Silviu Covrig Dusa (Be-Target)
  • Jim Fast (Engineering + Costing) - Chair
  • Joe Grames (Accelerator/KLF beam)
  • Todd Satogata (Accelerator/KLF beam)
  • Jim Shanks (CPS)
  • Lorenzo Zana (CPS)
  • Ed Folts (Division Safety Officer – Observer)
  • Doug Higinbotham (Observer)

Tentative Agenda

  • Moskov Amaryan [KLF: Overview], and #9.
  • Eugene Chudakov [KLF: Readeness, Cost estimation]: #1,12,13.
  • Hovanes Egiyan [CPS: Conceptual design and Radiation factors:] #2,3,4,10.
  • Igor Strakovsky and Vitaly Baturin KPT: Conceptual design and Radiation factors: #5,6,7,12.
  • Mikhail Bashkanov KFM: Status Report: #8,12.
  • Timothy Whitlatch [CPS and KPT: Engineering design, Cooling, and Cost estimation:] #2,3,5,6,12,13.
  • Geoffrey Krafft [Beam bunch space:] #9,10,11.

Documents