Difference between revisions of "July 28th, 2023"
Jump to navigation
Jump to search
Line 8: | Line 8: | ||
:* We shall discuss: | :* We shall discuss: | ||
:** options to move upstream the whole CPS | :** options to move upstream the whole CPS | ||
− | :** options to deflect 0.5 GeV - | + | :** options to deflect 0.5 GeV - 5 GeV muons on one side of the beamline: |
:*** 1) increasing the permanent magnet Bdl or | :*** 1) increasing the permanent magnet Bdl or | ||
:*** 2) switching from a pure permanent to a permanent/powerd magnet | :*** 2) switching from a pure permanent to a permanent/powerd magnet |
Revision as of 18:41, 24 July 2023
Attended: Moskov, ...Igor.
- On Aug 2nd, ERR-I is sceduled. All details are in [1].
- On July 25th, we had a Marco muBDX@KLF/CPS meeting disciss the following...
- Tonino will give a short presentation about the work he did in the old configuration and the integration in the new [].
- We shall discuss:
- options to move upstream the whole CPS
- options to deflect 0.5 GeV - 5 GeV muons on one side of the beamline:
- 1) increasing the permanent magnet Bdl or
- 2) switching from a pure permanent to a permanent/powerd magnet
- 3) adding a further magnet downstream
- options to shield the detector set up
- weight, available clearance, of the two dipoles necessary to determine incoming/scattered muon momentum
- other possible issues
- coordination with KLF Coll and Hall-D team
- On July 24th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].
- Thermal analysis of the CPS absorber in ANSYS (Tim)
- CPS presentation at ERR-1 (Hovanes)
- CPS technical note (Hovanes, Pavel)