Difference between revisions of "July 28th, 2023"

From kl project
Jump to navigation Jump to search
Line 8: Line 8:
 
:* We shall discuss:
 
:* We shall discuss:
 
:** options to move upstream the whole CPS
 
:** options to move upstream the whole CPS
:** options to deflect 0.5 GeV - 5GeV muons on one side of the beamline:
+
:** options to deflect 0.5 GeV - 5 GeV muons on one side of the beamline:
 
:*** 1) increasing the permanent magnet  Bdl or
 
:*** 1) increasing the permanent magnet  Bdl or
 
:*** 2) switching from a pure permanent  to a permanent/powerd magnet
 
:*** 2) switching from a pure permanent  to a permanent/powerd magnet

Revision as of 18:41, 24 July 2023

Attended: Moskov, ...Igor.

  • On Aug 2nd, ERR-I is sceduled. All details are in [1].


  • On July 25th, we had a Marco muBDX@KLF/CPS meeting disciss the following...
  • Tonino will give a short presentation about the work he did in the old configuration and the integration in the new [].
  • We shall discuss:
    • options to move upstream the whole CPS
    • options to deflect 0.5 GeV - 5 GeV muons on one side of the beamline:
      • 1) increasing the permanent magnet Bdl or
      • 2) switching from a pure permanent to a permanent/powerd magnet
      • 3) adding a further magnet downstream
    • options to shield the detector set up
    • weight, available clearance, of the two dipoles necessary to determine incoming/scattered muon momentum
    • other possible issues
    • coordination with KLF Coll and Hall-D team


  • On July 24th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].